Laserfiche WebLink
<br />\ <br /> <br />" ""-1 <br />,'i.~ .1.... <br /> <br />FORF:WORO <br /> <br />9 <br /> <br />December. Fir,t contracts awarded by District for distri, <br />bution system tunnels, including Monrovia Nos, I, 2, and 3, <br />and Pasadena, <br /> <br />1935 February, District took over from the contractor the con, <br />strnction of San Jacinto tnnne!. <br />August. Rivers and Harbors bill passed by Congregs and <br />approved by the President validated con,truction contract <br />between Secretary of Interior and Six Companies, Inc. for <br />construction of Parker dam. <br />August. Contract awarded for construction of Cajalco <br />dam and dike. <br />September, Contract awarded for 230,kv transmission <br />line, <br />November, Contract awarded for building the first pump, <br />ing plants - Intake and Gene, <br />November. First cont..,.cts awarded for distribution sys, <br />tem pipe lines. <br /> <br />1936 January, Contracts awarded for furnishing the first fif, <br />teen pumps to be installed in the pumping plants. <br />May, Contracts awarded for furnishing synchronous <br />motors for the fifteen pumps. <br />October, Colorado River first diverted through tunnel, at <br />Parker dam. <br /> <br />1937 May, COllcrete lining completed in CoacheIla tunnels. <br />July. First concrete placed in Parker dam, <br />August. 230,kv Boulder transmission line completed, <br /> <br />February, Cajalco dam and dike completed, <br />July, Construction of last pumping plant at Hayfield com, <br />pleted, First water over Parker dam, <br />August. Gene Wash and Copper Basin dams completed, <br />December, Contract a warded for Palos Verdes reservoir. <br /> <br />February. Upper feeder completed to Eagle Rock. <br />October, Palos Verdes feeder completed, <br />November, First Colorado River water reached Cajalco <br />Basin, <br />November, Contract awarded for construction of soften, <br />ing and filtration plant on the upper feeder at La Verne, <br />November, Construction of Parker power plant started by <br />U, S, Bureau of Reclamation, earlier than originally planned, <br />in order to relieve a severe power shortage in Arizona and to <br /> <br />1 <br /> <br /> 1938 <br />, <br />I <br />, <br />'! <br />:1 <br /> 1939 <br />:( <br />I <br />I <br /> <br />~ <br />