My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01201
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:44 PM
Creation date
10/11/2006 10:15:24 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
6/10/1982
Author
WAPA
Title
Public Information Forum - Consolidated Power Marketing Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project at the Fifth Water site on Diamond Fork. Dunham Point has been <br />replaced by Campbell Point in some of ReClamation's later alternatives. The <br />sum of all these projects amounts to nearly 5,000. MW. It is conceivable <br />that some of these projects could be online before 1999. <br /> <br />In the case of Diamond Fork, the Bureau of Reclamation in cooperation with <br />WAPA is pursuing expressions of interes:t in a non-federal funding concept. <br />Several expressions have already been received and some meetings have been <br />held to more fully explain the concept. A target date of 1985 has been set <br />for initial construction and an on-line date by 1990-1992. <br /> <br />= <br /> <br />,'6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.