Laserfiche WebLink
<br />Project at the Fifth Water site on Diamond Fork. Dunham Point has been <br />replaced by Campbell Point in some of ReClamation's later alternatives. The <br />sum of all these projects amounts to nearly 5,000. MW. It is conceivable <br />that some of these projects could be online before 1999. <br /> <br />In the case of Diamond Fork, the Bureau of Reclamation in cooperation with <br />WAPA is pursuing expressions of interes:t in a non-federal funding concept. <br />Several expressions have already been received and some meetings have been <br />held to more fully explain the concept. A target date of 1985 has been set <br />for initial construction and an on-line date by 1990-1992. <br /> <br />= <br /> <br />,'6 <br />