My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01178
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:38 PM
Creation date
10/11/2006 10:14:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.700
Description
John Martin Reservoir - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
2
Date
11/1/1991
Title
Annual Report of the Operations Secretary Concerning the Operation of John Martin Reservoir - 1991 - Part 1 of 2
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />.. <br />~:*' <br /> <br />ROY ROMER <br />Governor <br /> <br /> <br />c.;:J <br />c.;:) <br />.- <br />.- <br />a:> <br /><:.0 <br /> <br />DIVISION OF WATER RESOURCES <br />WATER DIVISION II <br /> <br />Sleven J. Witte <br />Division Engineer <br />219 W. 5th Street. Aoorn 223 <br />f'.0. Box 5728 <br />Pueblo. Colorado B 1 003 <br />(719) 542-3368 <br /> <br />Jul y 8, 1991 <br /> <br />Mr. Danni e McMi II an <br />Water and Sewer Superintendent <br />City of Lamar <br />P. O. Box 270 <br />Lamar, CO 81052-0270 <br /> <br />Dear Mr. McMillan: <br /> <br />It is my understanding that your letcer of June 7, 1991 did not <br />correctly state your intent regarding the total volume of Fry-Ark <br />wacer which you wanted to be released from Pueblo reservoir and to <br />be subsequentlY regulated through John Martin Reservoir. <br /> <br />This is to advise you that release of 1000 a.f. from Pueblo <br />Reservoir was initiated on 7/3/1991 and that if the City of Lamar <br />wishes to effect operations. for the regulation of any additional <br />amounts beyond that which has been initiated. it will be necessary <br />to submit a separate written notice addressing the desired teras of <br />the proposed operation. <br /> <br />): If you have auestions about this or if I can be of any assistance to <br />you, please feel free to call on me. <br /> <br />Sincerely, <br /> <br />.~J !\J!)fl- <br /> <br />Steven J. Witte <br />Arkansas River Compact Administration <br />Operations Secretary <br /> <br />SJW: crs <br /> <br />cc: Bill Howland <br />steve Kastner <br /> <br />JERIS.. DANIELSON <br />State Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.