My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01172
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:37 PM
Creation date
10/11/2006 10:13:53 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
822.600.10
Description
Colorado River Annual Operating Plan - Annual Reports
Basin
Colorado Mainstem
Date
1/1/1997
Author
USDOI/BOR
Title
Annual Operating Plan
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1944 Mexican Water Treaty <br /> <br />Pursuant to the 1944 Mexican Water Treaty it has been determined that under most probable <br />inflow conditions, water in excess of that required to supply uses in the United States will not <br />be available. Vacant storage space in mainstem reservoirs is substantially greater than that <br />required by flood control regulations. Therefore, a volume of 1.850 MCM (1.5 MAP) of <br />water will be scheduled for delivery to Mexico during calendar year 1997 in accordance with <br />Article 15 of the 1944 Mexican Water Treaty and Minute No. 242 of the International <br />Bound8l}' and Wllter Commission. Minute No. 242 provides that the United States may <br />deliver up to 173 MCM (.140 MAP) of water across the land bound8l}' at San Luis, Sonora, <br />and in the lirnitrophe section of the Colorado River downstream of Morel os Dam, in partial <br />satisfaction of the 1944 Mexican Water Treaty. Calendar year schedules of monthly <br />deliveries of Colorado River water are formulated by the Mexican Section of the mwc and <br />presented to the United States Section before the beginning of each calendar year. <br />Additional scheduled deliveries to Mexico can be made only if there exists Colorado River <br />water in excess of that necessary to satisfY the requirements in the United States and the <br />guaranteed quantity of 1,850 MCM (1.500 MAP) annually to Mexico. <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.