My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01139
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:30 PM
Creation date
10/11/2006 10:12:50 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1996
Author
CRBSCF
Title
1996 Review - Water Quality Standards for Salinity - Colorado River System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />o <br />-...1 <br />0) <br /> <br />"Policy for Use of Brackish and/or Saline Waters for Industrial Purposes;" , <br /> <br />"Policy for Implementation of the Colorado River Salinity Standards <br />Through the NPDES Permit Program for Intercepted Ground Water;" and <br /> <br />"Policy for Implementation of the Colorado River Salinity Standards <br />Through the NPDES Permit Program for Fish Hatcheries. " <br /> <br />3. Implementation of non-point source management plans developed by the states and <br />approved by EPA. <br /> <br />Item 1 of the plan of implementation listed above is to be implemented by federal agencies <br />in conjunction with state, local and private participants. The Forum works jointly with federal <br />agencies on developing the units and measures to be implemented. The Forum also urges <br />Congress to ensure that the funds necessary to successfully implement all phases of this plan of <br />implementation are appropriated as needed. Items 2 and 3 above are primarily implemented by <br />each of the Basin states. <br /> <br />The major components of this Review's plan of implementation are the federal programs. <br />Table 1 summarizes the salinity control achieved by the federal participants under the Program's <br />original authorities and the salinity control measures which must be implemented in order to meet <br />the goal of approximately 1.48 million tons of salt-load reduction annually by 2015. These federal <br />programs are described in detail in Chapter 4 of this Review. <br /> <br />vi <br />
The URL can be used to link to this page
Your browser does not support the video tag.