My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01131
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:22:45 PM
Creation date
10/11/2006 10:12:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8067
Description
Section D General Federal Issues/Policies-Section 7 Consultations
Date
11/12/1980
Title
Federal Water Rights 1973-83-BLM Water Rights Policy and Procedures
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />8 <br /> <br />6. Proposed uses of water: . <br />and extent of need, including, but not limited to, the following: people <br />served, acres irrigated, livestock watered, products produced, recreational <br />visitor days per year, or other <br /> <br />7. If developments or impoundments are proposed, complete the following: <br /> <br />(a) Conduit (pipe) or ditch: <br /> <br />Elevation at inlet <br /> <br />; Length ; Slope ft. per 1000 ft. <br />(c.f.s.) (~.p.d.) <br />(Circle one of aDove)-~~~~~- <br />(ft., m.s.l.), or outlet (ft., m.s.l.) <br /> <br />Diameter/Depth <br />---~~~~Capacity-at_outlet <br /> <br />(b) Storage tank(s) or trough(s): <br /> Width/Diameter , Length Depth <br /> Capacity gal.; Shape <br /> Width/Diameter ; Length , Depth <br /> Capaci ty ~al.; Shape <br />(c) Other (state type and include dimensions) . <br /> <br />(d) Estimated development costs: <br />Condui t . . . . .. . . . . . <br />Tank(s) or Trough(s) <br />Other <br /> <br />Materials <br />$ <br />$ <br />$ <br /> <br />Labor <br />$ <br />$ <br />$ <br /> <br />Total <br />$ <br />$ <br />$ <br /> <br />Total Cost $ <br /> <br />(e) Proposed date construction is' to begin <br /> <br />(f) Proposed date construction is to be completed <br /> <br />(g) Proposed date of full use of water applied for <br /> <br />8. If the water is to be impounded, stored, transported, or distributed on or <br />across the public land, a right-of-way permit is required by the applicant. <br />Title V of FLPMA provides the sole means of granting t~e needed right- <br />of-'''ay. <br /> <br />(a) If you already possess such a document, fill in the serial number <br />of the authorization. Serial No. <br /> <br />(b) If you have yet to secure such a document, a right-of-way application . <br />should be filed in accordance with 43 CFR 2800: Rights-of-Way, <br />Principles and Procedures. <br /> <br />Attachment 1 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.