Laserfiche WebLink
<br />. . <br />I ;., <br /> <br />following standard format are given for each proposed study in <br />Attachment A of the Research Plan. <br /> <br />VII. Studv schedule: <br /> <br />The Core-Research Studies are long-term studies that will be conducted <br />on an annual basis until 1996. Hypothesis-Testing Studies, and Habitat <br />Management/Evaluation Studies are short to long term studies that will <br />last one to five years. A proposed timeline for each study can be found <br />in Tables I and 2 of the attached Research Plan <br /> <br />VIII.FY-1993 throuqh FY-1996 Work <br /> <br />Fiscal Year 1993 through 1996 work will include ongoing Core-Research <br />Studies, multi year Hypothesis-Testing or Habitat-Management/Evaluation <br />studies, and high priority new Hypothesis-Testing studies or Habitat- <br />Management/Evaluation studies. A preliminary list of proposed <br />Hypothesis-Testing Studies and proposed dates of implementation can be <br />found in Table 2 of the actachment. <br /> <br />IX. Budqet Summary <br /> <br />FY-1993 - A summary budget by agency and study for FY-93 is shown in <br />Table 3 of the attached Research Plan. Expenditures for the fiscal year <br />will total $394,500 (not including FWS overhead). Total budget for the <br />fiscal year with Service overhead costs totals $410,600 <br /> <br />Future Fundina Needs' <br /> <br />FY-1994 - (Estimated)- $410,300 <br />FY-1995 - (Estimated)- $426,700 <br />FY-1996 - (Estimated)- $443,800 <br /> <br />'Does not include BOR-FWS transfer/overhead costs <br /> <br />3 <br />