Laserfiche WebLink
<br />-' <br /> <br />~:;:;:;~ <br /> <br />~ <br />C'.~ <br /> <br />,," <br /> <br />~:>'. . <br /> <br />SAN MIGUEL PROJECT <br />AN OUTLINE OF ALTERNATIVE PLANS CURRENTLY BEING STUDIED <br /> <br />Plans That Involve A Dam And Reservoir On The San Miguel River <br />1. Site 111 7. c. Pump From Tunnel <br /> Site 1/2 8. d. Pump From River <br />2. a. Gravity Irrigation 9. e. PO~Ter Generation <br />3. b. Sprinkler Irrigation 10. Site 1/4 <br />4. Site 1/2.8 11. Clayhorse Site <br /> 'Site 1/3 Logging Camp Site <br />5. a. Small Acreage 12. . a. Large Acreage <br />6. b. Large Acreage 13. b. Small Acreage <br />. Plans That Involve A Dam And Reservoir On An Off-Stream Site <br /> <br />14.. Beaver Creek Site <br />il!" <br />Ij' <br />~ Maverick Draw Site <br />',,, <br />., <br />15: a. Pump to Canal <br />16. b. Pump to Laterals 17. c. <br /> <br />Conservation Plans <br /> <br />Pump to Laterals- <br />small acreage <br /> <br />. <br /> <br />18. Upgrade Existing System And Convert To Sprinklers <br /> <br />Improve High Elevation Runoff Collection (Not viable) <br /> <br />Benefit and Cost Analysis <br /> <br />Fold-out Sheet of Costs, Benefits, and Benefit-Cost Ratio <br /> <br />for Each Alternative <br /> <br />, <br />