Laserfiche WebLink
<br />U~~-~~-l~~o 15'55 <br /> <br />CRBSCF - BIWC <br />. <br /> <br />P.ll <br /> <br />. <br /> <br />APPENDIX XIII <br /> <br />X111.3 <br /> <br />1301 <br /> <br />MlNlJTE NO. 218 <br /> <br />RECOMMENDATIONS ON niE COLORADO RIVER SAUNITY PROBLEM <br /> <br />The CommliSlon met In the offlcll of thll MlZldcan 5fZcdon In Qudad Juarez, Chihuahua. al 12;00 m on <br />March 22. 1965. 10 comply with Il\lll'ucllon9 II has received from thll lWo Gowmments. to consider <br />measurea "10 rach a. flfZl'miUient end effllCllve solution" of the flroblem of the salinity of Ihe walers of the Col. <br />orado River which reach Mexlco. as conremflia!ad In the Presidenllal Communiques 01 March 16 and Juna <br />30. 1962 and February 22. 1964. <br /> <br />The CommliSlon revtew..d the mllasura which the lwo Governmenl9 ha"" laken to date to aIIl!111a18 l8m- <br />florllrtly the problem of salinl!y of walers of the lower Colorado River. and noted the reduction which has oc. <br />curred in the salinity 01 drainage "'alers from the WeJ\ton.Mohalllk Irrigation and Drainage District and that <br />continued Improvement Is anllclpaled. <br /> <br />The. Commlsslon. with the scientific and engineering studies made by beth Governments as a basis. <br />thereupon copied the follcwlng RaoluUon. subject 10 the approval of the l1li0 Governments, embodying <br />the foUowlng Rcccmmenc/GlioIlS: <br /> <br />1. That the United StaleS construct III Its expense an extension to the flresent WeJ\lon-Mohalllk Di5lrict's <br />drBlnage conveyance chann.... IUIlh aplldty of 3S3 cubic: feet (10 cubic melers! per SfZCOnd. along the left <br />bank of the Colorado River to a point below Morodos Dam. and a control structure in thaI exlension of the <br />channel In the ruch between Morelos Dam and the mouth of Ihe Araz DraIn. ",hlch structure ",auld permit <br />the dischlllgl! of the WeUton-Mohalllk DistI1ct's drainage "'alen 10 the bed of the river at a point either <br />abe"" or below Moreios Dam. <br /> <br />2. That the Commtsslon permit IIl<8CUUon of the \llCrks which may be required for the extension channel <br />lC pass through Morelos Dam. <br /> <br />3. That the extension channlll and control structure proposed in Recommendation 1 be operated and <br />malnlalned by the Uniled States at Its expense to discharge aU of the Wellton-Moha",k Dlslrict's drainage <br />"'aters below Morelos Dam. excepl those which are discharged above the 0Mn on !he days and III such <br />rates as Mexico may request In "'"ting. <br /> <br />4. That during the lIle of the present MInute and subject to the reservations of Recommendation 11. the <br />Commission account for WeUlOn-Mohawk District's drainage waters lIS a pan of those described In the pro' <br />visions of Article 10 of the Water Treaty of February 3. 1"944. \lIith the understanding: a) !hat on the days <br />for which MexIco requests ",ater al the minimum winter rate of dllli""rt", of 900 cubic feet 125.5 cubic <br />mel~l plll' second. the United Sllltes conll'ol watlll'S reachlnlllhe Iimill'ophe section of the Colorado River <br />so !hal \lIithoutlncludlng Welhon-Mohalllk Di51l'ids drainage "'ateI's. !hetr flows be not less !han 800 cubic <br />feel (22.7 cubic metersl per second, their awrage 1I0w be nOlless than 900 cubic leet (25.5 cubic mflt2lS1 <br />per second for the total of such days dwing each winter period for which the minimum rale is requested. <br />and that the compul.lllion of that average flow nOl take into account 1I01llli in excess of 1000 cubic feet (28.3 <br />cubic meterSl per second: and b) that the wlntlll' periods In reference extend from October 1 of each year <br />through February of the next following year. <br />