My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01076
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:14 PM
Creation date
10/11/2006 10:07:55 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.300
Description
Wild and Scenic-Gunnison River
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/1990
Author
DOI-NPS
Title
Black Canyon of the Gunnison National Conservation Act of 1990-92-Corres Reports etc-Resource/Boundary Evaluation for Lands Adjacent to Black Canyon of the Gunnison National Monument
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I . J.; .J" .'\) <br />."...,'r. ll:-- 1.. 4.' <br /> <br />Option B - Gunnison Gorge National Conservation Area <br /> <br />The BlM has indicated "The management objectives and direction established for the <br />Gunnison Gorge Special Recreation Management Area would be the same once the area <br />is designated a National Conservation Area (NCA). The primary changes would be in <br />intensity of management." Therefore, the management direction identified under Option <br />A for Units 4 and 6 would be the same for this option (B). <br /> <br />The BlM indicated the following actions address those changes that would occur as a <br />result of an NCA designation; however, all establishing NCA legislation directs BlM to <br />prepare a plan for the management, use, development, and protection of each NCA <br /> <br />Facilities <br /> <br />.Existing toilets at Chukar Trailhead and Gunnison Forks Wildlife Management Area <br />would be replaced with solar composting units as opposed to self-composting <br />toilets identified under Option A <br /> <br />.A mobile sanitation waste-disposal system would be installed at Gunnison Forks <br />(f1oatboater take-out). <br /> <br />.Two visitor contact stations would also be constructed and access roads to these <br />two stations at Gunnison Forks and at Peach Valley and Chuckar Road junction <br />would be paved. <br /> <br />Administration. Preliminary estimates indicate Option B would require an annual funding <br />increase of approximately $94,000 in the BlMs budget to administer the area if designated <br />the GGNCA. Such cost would be subdivided as follows: <br /> <br />STAFF <br />(1) NCA Manager GS-9 . . . . . , . . . . . . . . . . . . . . . .. $26,000* <br />(1) Ranger GS-7 . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 21,000* <br />(1) Maintenance Worker GS-6 . . . . . . . . . . . . . . . . . .. 19,000* <br />(1) Interpretive Specialist seasonal (6 months) GS-5 . . .. 6,000 <br />(2) Recreation Technicians (6 months) GS-4 ........ 10.000 <br />subtotal . . . . . . . . . . . . . . . . . ' , . . $82,000 <br /> <br />EQUIPMENT IOTHER <br />(2) GSA Vehicles. . . . .. ...,.........'......... $7,000 <br />Miscellaneous cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.000 <br />subtotal . . . . . . . . . . . . . . . . . . . . .. 12,000 <br />GRAND TOTAL . . . . . . . . . . . . . " $94,000 <br /> <br />*Cost includes salaries and benefits <br /> <br />In Alternative 3, options A and B, there would be no economic impact on current use <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.