Laserfiche WebLink
<br />fl. : <br />'. ' <br />I : <br />, I <br />I' , <br />1 <br /> <br />OurLINE OF VOLUME I - REPORT <br />( continued) <br /> <br />Section <br />Number <br /> <br />Section and Subsection Titles <br /> <br />XIII <br /> <br />ESTIMATED CONSTRUCTION COST AND CONSTRUCTION <br />SCHEDULE <br />A. General <br />B. Basis of Cos ts <br />1. Direct Construction Cost <br />2. Contingencies <br />3. Engineering and Client Administration <br />4. Escalation <br />5. Total Construction Cost <br />C. Cost Estimate for Project <br />D. Design and Construction Schedule <br />E. Additional Costs of Water Supply <br />Delivery <br /> <br />XIV <br /> <br />FINANCIAL ANALYSIS <br />A. General <br />B. Proj eeted Capital Requirements <br />C. Estimated Financing Requirements <br />D. Estimated Debt Service Requirements <br />E. Revenue Requirement Forecasts <br />F. Projected Revenues (Existing Rates) <br />G. Adequacy of Revenues <br /> <br />XV <br /> <br />REFERENCES <br /> <br /> <br />Page <br />Number <br /> <br />XIII-l <br />XIII-l <br />XIII-l <br />XIII-l <br />XIII-2 <br />XIII-2 <br />XIII-2 <br />XIII-2 <br />XIII-2 <br /> <br />XIII-3 <br /> <br />XIV-l <br />XIV-l <br />XIV-l <br />XIV-2 <br />XIV-2 <br />XIV-2 <br />XIV-3 <br /> <br />I <br />,I <br /> <br /> <br />I <br /> <br />.,i <br /> <br />