My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01061
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:09 PM
Creation date
10/11/2006 10:07:40 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.913
Description
South Platte Projects - Spinny Mountain
State
CO
Basin
South Platte
Date
2/1/1974
Author
RW Beck and Assoc.
Title
Spinney Mountain Project Feasibility Report Vol 1 - Report (3 Volume Set)
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />OUTLINE OF VOLUME I - REPORT <br /> <br />SPINNEY MOUNTAIN PROJECf <br /> <br />FEASIBILITY REPORT <br /> <br />Section and Subsection Titles <br /> <br />Page <br />Number <br /> <br />Letter of Transmittal <br />Engineering Certification <br />General Outline of Report <br />Outline of Report <br />List of Tables <br />List of Figures <br /> <br />SUMMARY. FINDINGS. AND RECOMMENDATIONS <br />A. Authorization and Scope I-I <br />B. Project Investigations 1-1 <br />1. Alternative Sitea I-I <br />2. Project Foundation and <br />Materials Investigations I-I <br />3. Project Topography and Surveying 1-2 <br />4. Hydrology and Meterology 1-2 <br />5. Environmental and Archaeological 1-2 <br />6. Water Rights 1-2 <br />7. Water Supplies 1-2 <br />8. Operation Studies 1-2 <br />9. South Platte River Capacity 1-2 <br />C. Summary and Findings 1-3 <br />1. Water Requirements 1-3 <br />2. Water Supplies 1-3 <br />3. South Platte Storage Alternatives 1-3 <br />4. General Operations 1-5 <br />5. Results of Operation Studies 1-5 <br />6. Reservoir Size 1-6 <br />7. Site Location and Conditions 1-8 <br />8. Field Investigations 1-8 <br />9. Geology Sub-Surface .Investigations <br />and Material Testing 1-9 <br />10. Spillway Hydrology 1-9 <br />11. Alternative Project Arrangements 1-9 <br />12. Description of Selected Project <br />Arrangement 1-9 <br />13. Estimated Construction Costs and <br />Schedule 1-10 <br />14. Financial Analyses 1-11 <br />D. Recommendations 1-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.