My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01021
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:55 PM
Creation date
10/11/2006 10:06:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441
Description
Colorado Big Thompson Project
Basin
South Platte
Water Division
1
Date
1/1/1987
Title
Northern Colorado Water Conservancy District Waternews
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Supply and Storage Company; this <br />engineering marvel collected ~now runoff <br />high on the mountains above ithe <br />headwaters of the Grand River and <br />transported it approximately 5; 1/2 miles <br />through unlined ditch and wooqen flumes <br />to the Poudre River. <br />Still operating today, andlexpanded <br />to a full 17 miles in length, the Grand <br />River Ditch has been placed op the <br />National Register of Historic RJaces\ a <br />reminder of the efforts early d~y farmers <br />made at supplying additional water for the <br />northern Front Range. <br />The Michigan Ditch was gegun in <br />1902. This ditch started at Lake Agnes and <br />brought Michigan River water toto the <br />Poudre Basin. The Michigan DJtch was <br />later purchased by the North Poudre <br />Irrigation Company which sold ~t to the <br />City of Fort Collins in the mid 19i1Os. Fort <br />Collins operates and maintains ~his ditch <br />too~. : <br />The Laramie~ Poudce Resertoir and <br />Irrigation Company began cons~cting a <br />tunnel to bring more Laramie Riv~r water <br />into the Poudre basin in 1909. A 2 1/4 <br />mile long tunnel was built throt{gh Green <br />Mountain to provide for this di\tersion. <br />This project! finished in 1911\ Was taken <br />over shortly thereafter by the Wat~r Supply <br />and Storage Company which still9perates <br />it tooay. . <br />All told, the addition of . <br />approximately 40,000 acre,feet i~to the <br />Poudre Basin helped service the needs of <br />the northern Front Range for man~( years. <br />But with the advent of the Depress.' on and <br />irsaccompanyingdrought, anew dev.eq. <br />larger undertaking was needed. It was at <br />this point that a concentrated effort to <br />, secure state and/or federal fundin~ for a <br />larger transmountain diversion prolect was <br />intensified. These efforts culminated in the <br />Colorado#Big Thompson Project. ; <br /> <br />0)' <br />00 <br />CO <br />.-j . <br />Q <br />o <br /> <br />Grand River <br />Ditch <br /> <br /> <br /> <br />Laramie River bitch <br /> <br /> <br />. . . and Now <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.