Laserfiche WebLink
<br />,- -- -- --- <br /> <br />."r- <br />\,.;j:;'" <br /> <br />d. The Mexican Treaty obligation limited to a <br /> <br />scheduled 1.5 million acre-feet per year <br /> <br />e. The diversion requirements of mainstream projects <br /> <br />in the United States. <br /> <br />4. All uses of water from the main stem of the Colorado <br /> <br />River between Glen Canyon Dam and Lake Mead will be met by releases <br /> <br />from or water passed through Glen Canyon Reservoir or by tributary <br />inflow occurring below Glen Canyon Dam. Diversions of water directly <br />out of Lake Mead will be met in a similar manner or, if application <br />of the criteria of Paragraphs 7 and 8 hereof should so require, by <br />water stored in Lake Mead. <br /> <br />5. The United States will make an allowance for any de- <br />ficiency, computed by the method herein set forth, in firm energy <br /> <br />generation at Hoover Power Plant. For each operating year deficiency <br /> <br />in firm energy shall be computed as the difference between firm <br /> <br />energy which, assuming an over-all efficiency of 83 percent, would <br /> <br />have been generated and delivered at transmission voltage at Hoover <br /> <br />Power Plant in that year if Glen Canyon had not been on the river <br /> <br />and the energy actually generated and delivered at transmission volt- <br /> <br />age at Hoover Power Plant during that year adjusted to reflect an <br />over-all efficiency of 83 percent. At the discretion of the Secre- <br />tary, allowance will be accomplished by the United States delivering <br /> <br />t.: <br />.,.. <br /> <br />~~; <br /> <br />energy, either at Hoover Power Plant or at such other points accept- <br /> <br />able to both the Secretary and the affected Hoover power contractors, <br /> <br />or monetarily in an amount equal to the incremental cost of generat- <br /> <br />ing substitute energy. <br /> <br />2 <br />