Laserfiche WebLink
<br /> <br /> <br />Summary <br /> <br />LOCATED ANNUAL OM&R COSTS <br /> <br />Annual OM&R costs <br /> <br />REIMBURSABLE <br /> <br />&I water <br />tt>ower <br />Oi" Total reimbursable OM&R <br /> <br />$ 19,800 <br />327,100 <br />$ 346,900 <br /> <br />NONREIMBURSABLE <br /> <br />$1,951,300 <br />1,900 <br />4,700 <br /> <br />t <br />~, <br />:: <br /> <br />Recreation <br />Fish and wildlife <br />Flood control <br />Highway improvement <br />Total nonreimbursable <br />Total <br /> <br />$1,957,900 <br />$2,304,800 <br /> <br />MUNICIPAL AND INDUSTRIAL WATER <br /> <br />The unit in conjunction with existing M&I water supply facilities would <br />regulate 764,800 ac. -ft. of M&I water annually, the quantity required for <br />a future urban area of 2, 700, 000 people. <br /> <br />POWER <br /> <br />Hydroelectric peaking power would be generated by water released to meet - <br />M&I demands and water quality control. The generation capacity would be <br />138 MW. ;:'he Two Forks Powerplant would be tied in with the Western <br />Power Divfsion of the P-SMBP system. <br /> <br />Generation capacity............................ 138 MW <br />Load factor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17. 5 percent <br />Annual generation (average) ...... ............. .168,300,000 KWHR <br /> <br />1.7 <br /> <br />...- <br />