My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00980
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP00980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:41 PM
Creation date
10/11/2006 10:04:57 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.800
Description
John Martin Reservoir - Water Sales and Contracts
State
CO
Basin
Arkansas
Water Division
2
Date
12/1/1997
Title
Report of the Colorado State Engineer - Concerning Accounting of the Operations of an Offset Account in John Martin Reservoir for Colorado Pumping - 1997 -- Part 1 of 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> .-:-, <br />I " <br />tV <br />w <br />I --l <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />During the period referred to above, there have been two releases of water from the <br />Offset Account directed by the Kansas Chief Engineer. These are summarized in the <br />following table. <br /> <br />Oeseri tlon of Release <br />Kansas Stors e Char e Water <br />Colorado Consum live use Water <br />Colorado Consum live use Water <br />TOTALS <br /> <br />Quantitv Released (ae-Ill <br />473.49 <br />673.32 <br />1565.93 <br />2712.74 <br /> <br />Release End Date <br />Continued into next release <br />June 24, 1997 <br />Se tember 2, 1997 <br /> <br />Credit at Stateline (ae-Il) <br />NA <br />572.9 <br />1362.3 <br />1935.2 <br /> <br />Section 3 of this report provides copies of the letters reporting each delivery of water <br />to the Offset Account as required by paragraph 3 of the Resolution and reporting each <br />release of water from the Offset Account in conformance with paragraph 4 of the <br />Stipulation Re Offset Account in John Martin Reservoir dated March 17, 1997 <br />("Stipulation"). <br /> <br />Section 4 of this report provides copies of the monthly letters reporting Colorado <br />pumping and Offset Account operations, that were prepared and submitted in <br />accordance with paragraph 12 of the Resolution. <br /> <br />Return Flow Considerations. In August, 1997, 4000 acre-feet of water from <br />LAWMA's XY Article I) account was transferred to the Offset Account. At that time, the <br />allocation of the return flow component (1800 acre-feet) into its In State and State Line <br />components had not been made. Before these allocations could be made, a release of <br />1565.93 acre-feet was made in late August through early September, 1997. Because <br />the allocation of return flows had not been made before this release, the water used for <br />this release was accounted as coming from the other water in the Offset Account, <br />leaving the water transferred from Article II storage in the Offset Account until a proper <br />accounting can be made for its return flow components. It is recommended that the <br />allocation of the return flow water from this delivery from Article II storage should be <br />based upon when the consumptive use part of the delivery is released to replace <br />depletions to usable State line flow or is transferred to the Kansas Consumable Water <br />subaccount. At that time, the necessary releases of return flow water will be calculated <br />and made with the appropriate timing and quantities for both In State and Stateline <br />purposes. <br /> <br />Crediting Considerations. Because the Kansas Chief Engineer requested two <br />releases of water from the Offset Account this year, the consumable water determined <br />to be delivered to the Stateline pursuant to paragraph 2 of the Stipulation has been <br />credited to the entities which delivered the water to the Offset Account and will be <br />applied against depletions to usable Stateline flow in accordance with the Stipulation. <br />These credits are summarized in the preceding table and in the two letters in Section 3 <br />which summarize the Offset Account releases performed this year. Between the <br />initiation of the Offset Account in April and September 30, 1997, all depletions to usable <br />Stateline flow estimated in accordance with paragraph 5.B. of the Resolution have been <br />
The URL can be used to link to this page
Your browser does not support the video tag.