Laserfiche WebLink
<br />100,000 <br /> <br />A, <br /> <br />...-.... <br /> <br />10,000 <br /> <br />.... '" <br /> <br /> <br />.... <br /> <br />EXPLANATION <br /> <br />100 <br /> <br />UJ <br />::J <br />-' <br />;g: <br />z <br />-<: <br />Q <br />~ <br /> <br />PRE-DAM <br />(May 8, 1921-March 12, 1963) <br /> <br />POST-DAM <br />(March 14, 1963-September 30, 2000) <br /> <br />1,000 <br /> <br />o <br />z <br />o <br />o <br />UJ <br />rn <br />a: <br />UJ <br />0- <br />tu <br />UJ <br />LL <br />o <br />in <br />::J <br />o <br />;;;:: <br /> <br /> <br />10 <br /> <br />o 10 20 30 40 50 60 70 80 90 100 <br /> <br />ui <br />~ 100,000 <br />-<: <br />:r: <br />o <br />rn <br />Q <br />;;;:: <br />~ 10,000 <br /> <br />~ <br /> <br />B. <br /> <br />~ <br /> <br />EXPLANATION <br /> <br />--. ---- <br /> <br />-............. <br /> <br />'-, <br /> <br />19208 <br />(May 8, 1921-December 31, 1930) <br /> <br />19308 <br />(January 1, 1931-December31, 1940) <br /> <br />19408 <br />(January 1, 1941-December31, 1950) <br />- - - - 19S0s-early 19608 <br />(January 1, 1951-March 12, 1963) <br /> <br />POST-DAM <br />(March 14, 1963-September 30, 2000) <br /> <br />100 <br /> <br />".. <br />~., <br />.... "'-'" <br />....,..... \ <br />.....~:.... <br />...~..::.,..... \ <br /> <br />.... ~.::--.. \ <br />L.U -~.., ", <br />3 ............~ <br />-<:> ..... '.~ <br />,'': <br />Z ~, <br />-<: ' <br />Q ~ <br />UJ <br />:;; <br /> <br />'- <br /> <br />>- <br />-' <br />;;: <br />o <br /> <br /> <br />"--- <br /> <br />-'--.. <br /> <br />'1,000 <br /> <br />10 <br />o 10 20 30 40 50 60 70 8Q 90 100 <br />P~RCENTAGE OF TIME EQUALED OR EXCEEDED <br /> <br />Figure 25, Exccedance curves of the daily range in the discharge of 1118 Colorado River at Lees Ferry: (AI For the pre- and po:;t-dam periods, <br />1/3) For the four pre'dam decades and the entire post.dam period, <br /> <br />Operation of Glen Canyon Dam has evolved over <br />the four decades since elosure of the dam on March] 3, <br />1963 (fig, 2JA). From March 1963 through the latter part <br />of 1964, releases from Glen Canyon Dam were kept low <br />(with discharges kept close to 1,000 ft3/s for most of this <br />period) to increase the storage of water in Lake Powell <br />reservoir q~kly, Then, tram April through June 1965, a <br />;'!, j4<, ~ . <br />. . . <br /> <br />series of artificial floods was released from the dam, with <br />six of these floods having peak discharges greater than <br />50,000 n3/s, Between these flood peaks, discharges were <br />reduced to as little as lO,OOO 1l3/s, These 1965 floods were <br />designed to raise the elevation of Lake Mead reservoir and <br />to scour the reach immediately below Glen Canyon Dam <br />in order to increase the efficiency of the power plant at the <br /> <br />46 Computation and Analysis of the Instantaneous~Discharge Record fOf the Colorado River at lees Ferry. Arizona-May 8, 1921, through September 30, 2000 <br /> <br />