My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00978
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP00978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:41 PM
Creation date
10/11/2006 10:04:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8271.300
Description
Colorado River Basin Salinity Control Program - General Information and Publications-Reports
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1982
Title
Optimizing Salinity Control Strategies for the Upper Colorado River Basin
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ ;, ~', ' <br /> <br />"physical anc\ chemical. characteristics of the geologic formation ~her.. brine is <br />to be stored. <br /> <br />. (~ ' <br /> <br />..;.. <br />N <br />..;.. <br />W <br /> <br />There is SOme consideration of aupply1ng brines to industries such as oil <br />shal.. if they would wsnt it orcou1c1 use it. Milliken et a1. (1979) discuss <br />the l..galancl inst1tutio.nal factors associated with transf..rsof saline "Water <br />to energy related users. In acldition, there ;Lssom.. attention being given to <br />alt"rTll'tives such as piping the brines to natur8.l.ealt &inks such as Sevier <br />Laka in Utah. .. <br /> <br />Evaporation Ponds-- <br />Thl> area r..quired for evaJ)oration ponds c1..pends on the total brine flow <br />and natursl precipitation and the rata of evaporation. For ..xemple, if the <br />average annual evaporation rat.. for Paradox Valley or G1enwooclSp!~ng~ was <br />about one met..r, th..n th.. evaporation rate w9u1c1 average 3.2 x 10 . in /s/he <br />of poncl surface and an inflo"W rate of 0.06 m / swoulcl require a 190 hectare <br />pond. AcIc1itional evaporation area capacity is r..quired because the evapora- <br />tion rates ar.. d..press..d with inoreasing concsntration (Crow, 19&0; USDI-USDA. <br />1977). These ponds shoulcl also inclUde storages for seasonal variations in <br />evaporation since th...:tnf10w from a d..sa1ination plan or brine well field <br />would be const..nt.Th.. us..ful life of the. pond c1ep..ncls on the salt ancl sedij <br />ment d..positio.n on the bottom. The density of rock ealt is about 2.1S gm/ cm <br />and asa;t loecling of 163,000 Mgm/yr 'into a pond wouldeonsume a 'minimum of <br />75,000 m 30f capacity each year, and 236,000 Mgm/yr would annually deposit <br />104,000 m of salt. The life of the ponclscould beextendecl indefinitely if <br />the salt hlldany marketabll> value ancl "Woulcl be periodioal1y removecl. <br /> <br />: ' ',.,', " .' <br />. . .' <br />Watersaver, Inc. (1980) :Lndioateclmater:\.al. costs for .. 36mi1exposecl 2 <br />reinforeecl Hypalon-type liner. not including"earthwork, to be about $4.74/m <br />Or $47,360/ha. Laying and sealing costs coulcl be estil1lQted.on labor require- <br />m..nts of 150~200 man-hours/ha ..t $15.00/man-hour'"Which r..su1ts in labor costs <br />of $2230 to $2975/ha. <br /> <br />II <br /> <br />If the Hypalon-type liner Were to be covered by ..arth, at: leas t another <br />$72001he might: be expected. A30""1l\il PVC liner could not be exposed and "Woulcl <br />hav.. . to have an earthen covering, and total installecl coats would ):>e about <br />$38.500/ha, ho"Wever, PVC ~oulcl probably not b.. aa durable as Hypalon-type <br />liners. For purposes of this r..port, a cons~rvative value of $54,600/ha for <br />. inst$,11ation and a total:l.nstalledcost of $102,OOOlha waause/l.'rh" USDI, <br />WPRS (1980a) .inclicat..d that total costs inclucling earthwork could approach <br />'. ..,$.~,.4ep",oOOlhe.. Th.e USD1" WPRS.(1979} ,estimated that: 247 ha of evaporation <br />ponds, 6.1 m dup "With a 20 mil PVC bUTiecl liner co..ts about$178.650/hafor <br />the La Verkin Spring Project (OctOber, .1978pric..s).Inflsting this cost to <br />January, .1980., ueing .th.. Engineering News Record,lluilclingCost Ind..x (tm., <br />1980) factor of 1.10, the unit coatswoulcl be about $197,OOO/ha. <br /> <br />, <br /> <br />D....p Well Inj..ction-- <br />De..p well injection as a method of brine disposal offers several environ- <br />mental benefits. The primary advantag" is that very little terrestrial sur- <br />face are.. is required since the brines are injectecl into subsurfac.. geologic <br />fontStions. Th.. t..chnology of deep "Well injection is fairly ~el1 developecl <br />and has seen wicls use in the p..tToleum industry ~here oil field brines have <br /> <br />66 <br /> <br />. <br /> <br />. <br /> <br /> <br />"':' <br /> <br />. 'j.,.', <br /> <br />.,.,." <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.