My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00972
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP00972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:39 PM
Creation date
10/11/2006 10:04:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.C.4
Description
UCRBRIP Flooded Bottom Lands
Basin
Colorado Mainstem
Date
12/1/1995
Author
UCRBRIP
Title
Levee Removal Strategic Plan - Final Draft
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Products and Tilllefralllcs <br /> <br />Levee Removal <br /> <br />- Final selection of sites: December 1995 <br />- Breach or Remove Levees: February-April 1996 <br /> <br />Data Collection <br /> <br />- Three field seasom <br />- May - October <br /> <br />Reports <br /> <br />- Field trip summary reports for each sampling trip <br />- Field season summary report for each field season <br />- Annual Data Analysis Progress Report with Recommendations <br />- Annual RIP Report integrating these components <br />- Three Year Completion Report <br /> <br />Proiect Coordination <br /> <br />- Progr"-I1\ Coordinator will be responsible for Project Coordination <br />- Project will be stratified into three primary components <br />- Native fish evaluation <br />- Nonnative fish evaluation <br />- Food organism evaluation <br />- Each Project component wiil have a lead identified <br />- Leads for each project component will be responsible for component implementation <br />- Project component leaders will establish regular coordination meetings <br />- Field sampling activities will be a collaborative to the maximum extent possible <br />- This may include combined agency crews <br /> <br />Recommendations <br /> <br />- Design criteria for levee removal <br />- Trade off between levee removal and flow management <br />- Future actions <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.