Laserfiche WebLink
<br />I <br /> <br /> <br />diameter x l2-foot long stainless steel (Johnson Type) screen. The slot <br /> <br /> <br />opening size in the screens is 0.25-inch and the maximum approach velocity <br /> <br />is 0.5 feet-per-second. The approach velocity in this case is measured <br /> <br /> <br />less than 1 inch from the screen surface. The passive design of these <br /> <br /> <br />intake screens assures a uniform velocity distribution across the screen <br /> <br /> <br />surface. This reduces the attractive forces associated with high veloci- <br /> <br /> <br />ties and thus improves screen dependability and minimizes maintenance <br /> <br /> <br />cas ts. <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Each screen will include an airburst system for cleaning. The airburst <br /> <br />systems will be connected to air tanks at the pumping plant. Three <br /> <br /> <br />bulkhead gates will be provided for installation at the pumping plant bay <br /> <br /> <br />entrances for maintenance of the bays. There would normally be 15 to 25 <br /> <br /> <br />feet of head at the top of these gates. Drawing No. 922-600-204 shows the <br /> <br /> <br />pumping plant. <br /> <br />I <br />I <br />I <br /> <br />The discharge from the 12 pump units will be merged by a concrete encased <br /> <br /> <br />l2-branch manifold into a single discharge line, 120 inches in diameter and <br /> <br />I <br /> <br />9,785 feet long. A surge chamber approximately 30 feet in diameter will be <br />provided at the top of the hill above the pumping plant. Taps will be <br />i neluded in the discharge line to provide service to lands adjacent to the <br /> <br />I <br /> <br />discharge line. <br /> <br />I <br /> <br />Main Canal <br /> <br />I <br /> <br />The main canal will start at the end of the North Bay discharge line. A <br /> <br />Parshall flume will provide measurement of water entering the canal from <br /> <br /> <br />the discharge line. The water surface elevation of the main canal at the <br /> <br /> <br />discharge structure of the pumping plant will be 1502. The main canal <br /> <br /> <br />would traverse a side hill in a northeasterly direction for about the first <br /> <br /> <br />6V2 miles of its route. The canal will continue in an easterly direction <br /> <br />until it branches about 2 miles southeast o~ Ravinia. The branch that <br /> <br /> <br />flows north is called the North Branch Canal. A Parshall flume would be <br /> <br /> <br />located on the main canal here for me~surement. From there, the main canal <br /> <br />will follow sect ion lines and the old Milwaukee Railroad right-of-way to <br /> <br /> <br />the end at Wagner Relift Plant. The main canal capacity will vary from 710 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />36 <br /> <br />I <br />