<br />I <br />I <br /> <br />I <br /> <br /> TABLE 4 <br /> PUMPING PLANT COSTS <br /> (January 1983 Price Levels) <br /> Old Pumpin~1 Old Pumpin~1 New Pumping <br /> Plant Site Plant Site Plant Site <br /> Minimum Minimum Minimum <br /> Water Surface Water Surface Water Surface <br />Item Elevation 1320 Elevation 1335 Elevat ion 1335 <br />Pumping Plant $19,10.0,000 $17,90.0.,0.00. $18,80.0.,0.0.o.Y <br />Discharge Line 10.,300,0.0.0 10.,30.0.,0.0.0. 11,40.0.,0.0.0.1/ <br />Main Canal Savings -840. 0.0.0.4 I <br /> , - <br />Transmission Line +10.5,0.0.0.2/ <br />Increase <br />Assigned Power 10.,70.0.,0.0.0. 9,920,0.0.0. 10.,0.20.,00.0. <br />Investment <br />Total $40,100.,0.0.0. $38,120.,00.0. $39 ,485,0.0.o.~/ <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1./ <br />2/ <br />3/ <br />4/ <br />51 <br />""if <br /> <br />Does not include potential for increased right-of-way costs and <br />increased litigation costs. <br />Higher costs are, due to longer pumping plant intake at new site. <br />About V4 mile of extra discharge line is required at this site. <br />About lV2-mi1e reduction in main canal. <br />Length of transmission line increased .6 mile. <br />The cost of the pumping plant does not agree with the appended Project <br />Cost Estimate for the Preferred Plan because the estimates were revised <br />for this Planning Report and costs were indexed to January 1984 price <br />levels. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />27 <br />