Laserfiche WebLink
<br />TABLE 8 <br /> <br />WESTERN DIVISION - PICK-SLOAN MISSOURI BASIN PROGRAM <br /> <br /> POWERPLANT DATA <br /> Capacity Total Normal Output <br /> each installed operating at rated <br /> Number of Unit Capacity Head Head <br /> units (kW) (kW) (ft) (ft3/s) <br />Green Mountain 2 13,000 26,000 192-262 1,660 <br />Marys Lake I 8,100 8,100 202-217 550 <br />Estes 3 16,500 49,500 551-571 1,300 <br />Pole Hill 1 33,250 33,250 830-838 550 <br />Flatiron 2 43,000 86,000 1,096-1,118 1,070 <br />(FlatironV) I 8,500 8,500 158-287 440 <br />Big Thompson I 5,300 5,300 183-184 350 <br />Seminoe 3 15,000 45,000 97-227 2,850 <br />Kortes 3 12,000 36,000 192-204 2,700 <br />Fremont Canyon 2 . 33,000 66,000 247-363 2,200 <br />Alcova 2 18,000 36,000 153-165 2,800 <br />Glendo 2 19,000 38,000 73-156 2,800 <br />Guernsey 2 2,400 4,800 89-91 820 <br />Boysen 2 7,500 15,000 72-112 2,415 <br />Heart Mountain I 5,000 5,000 265-275 355 <br />Mt. El bert 2 103,000 206,000 447-477 6,400 <br />Ye 11 owta il 4 72 , 000 288,000 327-440 8,500 <br />Total 34 956,450 <br /> PUMPING PLANT DATA <br /> PumoinCl units Plant ratinCl Kwh to pump <br /> Number capacity Normal operating Install ed 1 acre-ft <br /> ft3/ shead (ft) (Hp) at maximum head <br />Granby 3 600 92-186 18,000 227 <br />Wi 11 ow Creek 2 400 167-169 10,000 225 <br />Flatiron IV 440 173 - 287 13,000 391 <br />Mt. El bert 2 5,690 447 -477 340,000 620 <br />T ota 1 8 381,000 <br />1/ 1959- 1988 <br />V Pumping plant which ma~ be operated in reverse to generate energy <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />