|
<br />TABLE 8
<br />
<br />WESTERN DIVISION - PICK-SLOAN MISSOURI BASIN PROGRAM
<br />
<br /> POWERPLANT DATA
<br /> Capacity Total Normal Output
<br /> each installed operating at rated
<br /> Number of Unit Capacity Head Head
<br /> units (kW) (kW) (ft) (ft3/s)
<br />Green Mountain 2 13,000 26,000 192-262 1,660
<br />Marys Lake I 8,100 8,100 202-217 550
<br />Estes 3 16,500 49,500 551-571 1,300
<br />Pole Hill 1 33,250 33,250 830-838 550
<br />Flatiron 2 43,000 86,000 1,096-1,118 1,070
<br />(FlatironV) I 8,500 8,500 158-287 440
<br />Big Thompson I 5,300 5,300 183-184 350
<br />Seminoe 3 15,000 45,000 97-227 2,850
<br />Kortes 3 12,000 36,000 192-204 2,700
<br />Fremont Canyon 2 . 33,000 66,000 247-363 2,200
<br />Alcova 2 18,000 36,000 153-165 2,800
<br />Glendo 2 19,000 38,000 73-156 2,800
<br />Guernsey 2 2,400 4,800 89-91 820
<br />Boysen 2 7,500 15,000 72-112 2,415
<br />Heart Mountain I 5,000 5,000 265-275 355
<br />Mt. El bert 2 103,000 206,000 447-477 6,400
<br />Ye 11 owta il 4 72 , 000 288,000 327-440 8,500
<br />Total 34 956,450
<br /> PUMPING PLANT DATA
<br /> PumoinCl units Plant ratinCl Kwh to pump
<br /> Number capacity Normal operating Install ed 1 acre-ft
<br /> ft3/ shead (ft) (Hp) at maximum head
<br />Granby 3 600 92-186 18,000 227
<br />Wi 11 ow Creek 2 400 167-169 10,000 225
<br />Flatiron IV 440 173 - 287 13,000 391
<br />Mt. El bert 2 5,690 447 -477 340,000 620
<br />T ota 1 8 381,000
<br />1/ 1959- 1988
<br />V Pumping plant which ma~ be operated in reverse to generate energy
<br />
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />1
<br />I
<br />I
<br />
|