Laserfiche WebLink
<br />TABLE OF CONTENTS (continued) <br /> <br />pagz <br />f . Trout Creek Dam and Reservoi r H-2 <br />g. Green River Alternative with Burns Pumping <br />Plant H-25 <br />h. Soldier Park Reservoir with Red Cloud Diversion <br />D~ H-~ <br />i. Oaks Park Reservoir Enlargement Alternative H-29 <br />j. Importation of Water H-30 <br />4. A 1 terna ti ve Plans and Features of the Proposed <br />Plan H-31 <br />a. Ratliff Reservoir Plan H-31 <br />b. Brush Creek Tunnel Plan H-33 <br />c. Buckskin Hills Canal Plan H-33 <br />d. Boan Reservoir Plan H-36 <br />e. Brush Creek Diversion Alternative H-36 <br />f. Tyzack Reservoir with Minimum Fishery Releases H-39 <br />g. Alternatives to Tyzack Dam Axis H-40 <br />h. Alternatives to Tyz8ck Aqueduct H-40 <br />i. Tyzack Recreational Facilities H-40 <br />j. Transmission Lines H-47 <br />5. Alternative Operations of the Proposed Plan H-48 <br />a. Maximum Irrigation H-48 <br />b. Maximum Municipal and Industrial Use H-49 <br />c. Maximum Fish and Wildlife Plan H-49 <br />d. Minimum Flows for Ashley Creek and <br />Rehabilitation of Grasshopper Flats H-49 <br /> <br />I. CONSULTATION AND COORDINATION WITH OTHERS 1-1 <br />1. Consultation and Coordination During Development <br />of the Proposal and Preparation of the Draft <br />Environmental Statement 1-1 <br />2. Coordination During Review of the Draft Environ- <br />mental Statement 1-2 <br />3. Summary of Public Hearing 1-3 <br />4. Disposition of Comments Received on the Draft <br />Environmental Statement 1-5 <br />a. Comments from Federal Agencies 1-7 <br />b. Comments from the State of Utah 1-41 <br />c. Comments from Others 1-47 <br />5. List of References 1-85 <br /> <br />ATTACHMENTS <br /> <br />iv <br />