My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00898
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:23 PM
Creation date
10/11/2006 10:00:17 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
9/11/1984
Author
USDOI/WAPA
Title
Revised Proposed General Power Marketing Criteria and Allocation Criteria
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />1983, and proposed special requirements for potential new <br /> <br />customers and wholesale utilities. Potential new customers <br /> <br />must have had a 1982 load greater than 100 kilowatts, and <br />except for Federal or State ultimate consumer-type loads, <br />must have taken substantive steps to obtain utility status <br />by January 1, 1984. Wholesale utilities were required to <br />satisfy the Administrator (i) that the benefits of federally <br />financed power are distributed at the lowest possible rates <br />to consumers consistent with sound business principles, (ii) <br />that consumers can identify their true power supply costs <br />from all sources so that the costs of growth and the <br />benefits of conservation are identifiable, and (iii) that <br />retailing utilities can identify cost and other significant <br />characteristics of each of its power supplies. <br /> <br />. <br /> <br />(a) Comments: <br /> <br />Criteria are not clear about whether filing ~pp1icant <br /> <br />profile data by December 30, 1983 is an eligibility <br /> <br />requirement. <br /> <br />The deadline for filing applicant profile data should <br />be extended beyond December 30, 1983. <br /> <br />The specific actions required by 1/1/84 to obtain <br /> <br />utility status are unclear; the deadline for obtaining <br /> <br />such status should be extended. <br /> <br />.~ <br /> <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.