My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00886
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00886
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:18 PM
Creation date
10/11/2006 9:59:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
4/16/1990
Author
BOR
Title
Annual Operating Plans - North Platte Project Water Years 1989-1990
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />! I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />rHO ~ 1')." <br /> <br />OPERATING CRITERIA FOR GREEN MOUNTAIN RESERVOIR <br /> <br />Paragraph 6 of the October 5, 1955, Stipulation and Decree (as amended <br />on October 12, 1955, and filed with the United States District Court <br />for the District of Colorado in civil action Nos. 2782, 5016, and 5017) <br />calls for the development and submission of operating plans for <br />Green Mountain Reservoir and are included as a part of this report. <br /> <br />The provisions that relate to the operation of Green Mountain Reservoir <br />are contained in the: <br /> <br />October 12, 1955, Stipulation and Decree <br />April 16, 1964, Stipulation and Decree <br />November 2, 1977, Memorandum Opinion and Order <br />February 9, 1978, Supplemental Judgment and Decree <br />Consolidated Case Nos. 2782, 5016, and 5017 <br />Senate Document No. 80, 75th Congress, 1st Session <br /> <br />Operations will be consistent with these provisions. <br /> <br />The criteria are listed below. <br /> <br />1. Winter operation (October 16-April 14) <br />a. Bypass inflow to supply downstream vested rights. <br />b. Replace water withheld by the CBT PrOject, as required. <br /> <br />c. Maximize power generation, while maintaining <br /> <br />(1) Adequate storage to meet the anticipated requirements of <br />Senate Document No. 80. <br /> <br />(2) A minimum power head which is consistent with the <br />integrated system power operations. <br /> <br />2. Operation during snowmelt period (April-July) <br /> <br />a. Bypass inflow, as required, to supply downstream vested rights. <br /> <br />b. Replace water withheld by the CBT Project, as required. <br /> <br />c. Fill without spilling. <br /> <br />d. Maximize power operation consistent with I.e. <br />e.Make releases as outlined in the above referenced documents.! <br /> <br />1 By the use of these criteri a for current operat i ng purposes, the <br />United States does not intend to imply any definition of rights and <br />obligations. The order in which these criteria are listed does not <br />reflect any intended priority. <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.