Laserfiche WebLink
<br />PHOTOGRAPHS <br /> <br />Photo No. <br />1 Artist's concept of Milly K. Goodwin Lake and <br />Soap Park Dam with proposed alinement of Black <br />Mesa Conduit. <br /> <br />Page <br /> <br />A-8 <br /> <br />2 Aerial view looking southwest at the entrance <br />portal site of the proposed Black Mesa Tunnel. <br />A possible disposal site for spoil would be in <br />depression below the tunnel portal. <br /> <br />3 Southward view of Curecanti Creek showing area <br />of proposed Curecanti Creek Diversion Dam. <br /> <br />4 Eastward view from the general area of the Black <br />M~sa Tunnel outlet looking back along the tunnel <br />alinement. <br /> <br />A-9 <br /> <br />A-10 <br /> <br />A-ll <br /> <br />5 Existing diversion works for the Fruitland Mesa <br />Ditch on Crystal Creek. The diversion would be <br />rehabilitated to supply water to the Fruitland <br />Canal. <br /> <br />A-14 <br /> <br />6 Aerial view of Gould Reservoir showing State <br />Hi ghway 92 crossing the upper half of the pi cture. <br />Establishment of a minimum pool would increase <br />the usefulness of this reservoir for fishery <br />and recreation. <br /> <br />A-16 <br /> <br />7 <br /> <br />Gould Siphon #2. The intake is on the hill <br />opposite, and the outlet and a portion of the <br />Gould Canal are in the foreground. <br /> <br />A-20 <br /> <br />8 The town of Crawford as seen from the south <br />along State Highway 92. A.21 <br /> <br />9 Dyer Creek at its confluence with Crystal Creek. <br />This is a possible gravel source for project <br />construction. A-23 <br /> <br />10 Aerial view of Fruitland Mesa Project Service Lands. <br />Supplemental lands in the Lower Iron Creek area <br />are in the left center of the photo. Supplemental <br />lands on Lower Fruitland Mesa are in the right <br />center just above Crawford Reservoir. Full service <br />lands on Upper Fruitland Mesa run across the upper <br />portion of the picture. . B-6 <br /> <br />vii <br />