My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00774
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:27:43 PM
Creation date
10/11/2006 9:56:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.a
Description
Animas La Plata Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/3000
Author
Unknown
Title
Animas La Plata Annual Operating Plan - From 2002 ALP-POC Notebook - Date Unknown
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002399 <br /> <br />Electrical System and Equipment <br /> <br />Change oil in standby gasoline engine-driven generator <br />Check exposed electrical wiring <br />o Outlet works valve house <br />o Gate hoists <br />o Spillway bridge <br />Check gate limit switches - adjust <br /> <br />ANNUALLY <br /> <br />Outlet Works <br /> <br />Paint <br />o Metalworks <br />o Color-coded valves <br />o Woodwork and trim <br />Exercise gates and valves <br />Check condition of interior and exterior of outlet conduit, including drain valves <br /> <br />.~ <br /> <br />Dam and Reservoir <br /> <br />Review the SOP and EAP <br />Conduct facility review by Bureau of Reclamation (BOR) Area Office personnel <br /> <br />'I <br /> <br />Electrical <br /> <br />Check electrical conduits, pull-boxes, and switches <br />o Outlet works valve house <br />o Gate hoists <br />o Spillway <br />o Galeries <br /> <br />" <br />! <br /> <br />3-YEAR PERIOD <br /> <br />Conduct Periodic Facility Review (PFR) with BOR Regional and Area Office and <br />Technical Service Center personnel <br /> <br />6-YEAR PERIOD <br /> <br />Conduct Comprehensive Facility Review (CFR) with BOR Regional and Area <br />Office and Technical Service Center personnel <br />Examine intake structure and stilling basin which normally are underwater. less <br />frequently if experience indicates <br />
The URL can be used to link to this page
Your browser does not support the video tag.