My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00774
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:27:43 PM
Creation date
10/11/2006 9:56:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.a
Description
Animas La Plata Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/3000
Author
Unknown
Title
Animas La Plata Annual Operating Plan - From 2002 ALP-POC Notebook - Date Unknown
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />oh~4a5 <br /> <br />Dentate: See "baffle block. " <br /> <br />\ <br /> <br />Designated frequency flood: ~ee "flood" etc. <br /> <br />Designers' Operating Criteria (DOC): Detailed operating criteria which stresses the <br />designers' intended use and operation of equipment and structures in the interest <br />of safe, proper, and efficient use of the facilities. Includes drawings and tables, <br />etc. <br /> <br />Design summary: A document that summarizes the' designers' development of the <br />design that results in the specifications. It may include a section on the Designers' <br />Operating Criteria. <br /> <br />Differential head condition: The condition in which the water pressure on the upstream <br />and downstream sides of an object differ (also called unbalanced head). <br /> <br />Downstream face: The inclined surface of the dam away from the reservoir. <br /> <br />Drain, blanket: A layer of pervious material placed to facilitate drainage of the <br />foundation and/or embankment. <br /> <br />Drop structure: A structure that conveys water to a lower elevation and dissipates the <br />excess energy resulting from the drop. <br /> <br />E <br /> <br />,~ ./ <br /> <br />Elevation-capacity table: A table giving reservoir storage capacity in terms of elevation <br />increments. <br /> <br />Emergency Action Plan (EAP): A formal plan of procedures designed to minimize an <br />emergency situation or unusual occurrence at a gi ven dam or reservoir. <br /> <br />Emergency Preparedness Plan (EPP): Predecessor to the term Emergency Action Plan. <br /> <br />Emergency reserve fund: Money reserved or required by contract to be reserved by an <br />operating entity for use in emergency situations involving facilities under the entity's <br />jurisdiction. <br /> <br />Epicenter, earthquake: Focal point on earth's surface directly above the origin of <br />seismic disturbance. <br /> <br />Erosion, concrete: Surface disturbance caused by abrasion from moving particles in <br />water, impact of pedestrian or vehicular traffic, or impact of icefloes. <br /> <br />Erosion, soil: Surface displacement of soil caused by weathering, dissolution, abrasion, <br />or other transporting. <br /> <br />I <br />I <br /> <br />""':~.~':::. <br /> <br />I <br />, , <br /> <br />..."-- <br /> <br />- I <br /> <br />I <br />! <br />.- <br /> <br />-, <br />; <br /> <br />-, <br /> <br />, ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.