My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00769
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:27:42 PM
Creation date
10/11/2006 9:56:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.766
Description
Gunnison River General Publications - Correspondence - Reports - Etc
State
CO
Basin
Yampa/White
Water Division
6
Date
3/1/1993
Author
Unknown
Title
Scoping Report for the Gunnison River Contract - Analysis Notebook - Section II - Comments by Item Codes
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />,;::)::?:~:':" <br />::':'(;",.;::.-:.; <br /> <br />.......; <br /> <br />.,. <br />~;.;,:,j( <br /> <br />",::...::--.. <br /> <br />001599 <br /> <br />Gunnison River Contract ScoDin2 - SORTED Comments <br /> <br />9. <br /> <br />1. 08. Reference No.5 above .(make releases meet as many needs as possible): can timing <br />be considered - timing is crucial - agencies (should) work together on releases. <br /> <br />9. 1. 18. Take into account dry years, upstream calls. Tie needs to forecasted amount of <br />available water each year. <br /> <br />1. 46. <br />use? <br />.2.1. !O. <br />river? <br />2.1. 26. <br /> <br />9. 2.1. 45. In years of severe drought, will (water rights) administration be strict or involve <br />sharing of shortages? (i.e., fish should share, so should hydropower) <br /> <br />9. <br /> <br />3. 03. <br />harmful. <br /> <br />High water at wrong time can hurt resources (fish); 3,000 cfs this month was <br /> <br />9. <br /> <br />3. 03. <br />harmful. <br /> <br />High water at wrong time can hurt resources (fish); 3,000 cfs this month was <br /> <br />9. <br /> <br />04. <br /> <br />Colorado Division of Wildlife will furnish flow data to support fishery. <br /> <br />3. <br /> <br />9. <br /> <br />3, II. Did this year's 3,000 cfs test consider "92" low snowpack? Would snowpack be <br />considered in contract to determine releases. <br /> <br />9. 3. 29. lhis year's 3,000 cfs release came in middle of brown trout emergence; release.is <br />beller in late May. Issue is timing of flushing flows, size of peak, and duration. Division of Wildlife <br />(DOW) ramping recommendations should be implemented. <br /> <br />9. 4. 03. For 1992 flushing flows, why did dates change (from late May to mid-May.release)? <br />How is timing planned? Isn't it supposed to be a coopcrative effort, considering hydropower, swim-up <br />trout, etc. concerns? <br /> <br />9. <br /> <br />4. 05. <br />flush. <br /> <br />Definc "window of opportunity" to protect both rainbowlbrown reproduction during. <br /> <br />9. <br /> <br />4. <br />much? <br /> <br />06. Do we know ideal ramping rate? Was 800 cfs (per day increase rate) in 1992 too <br />Ramping (rates needed) on ascending and descending release limbs. . <br /> <br />9. 4. IS. Reserved right: Consider right for hath Monument (1933) and its wilderness area <br />(1976). Since Blue Mesa right is 1957, how will this affect water deliveries? Contract should better <br />define reserved rights seniority and purposes. <br /> <br />9. <br /> <br />GREENO+; p9,'2. (Issue H. A-B Lateral, cont.2) The second cause for concern lies in the <br />potential for AB Lateral to contract for water from the Bureau of Reclamation out the 300,000 acre- <br />foot Aspinall Unit water supply, and thus reduce the total amount of water available to the Monument <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.