My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00753
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00753
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:27:38 PM
Creation date
10/11/2006 9:56:24 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
1/19/1982
Title
Narrows Unit Addendum to Definite Plan Report
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, ' <br /> <br />. <br /> <br />. <br /> <br />, , <br /> <br />Since the completion of the original water supply studies in the <br />mid-1960's and the completion of the feasibility report and DPR in 1967 <br />and 1973, respectively, there has become available 13 additional years <br />of streamflow records as published by the Geological Survey. The total <br />period of record has been extended from 15 (1947-1961) to 28 (1947-1974) <br />years. Because of the availability of these additional streamflow <br />records, it was decided to reanalyze the project water supplies available <br />for the unit. <br /> <br />The reservoir operation study for the period, 1947-1974, results <br />in an average annual project water supply at the dam of 133,000 acre-feet <br />which includes 31,000 acre-feet from the Weldon Valley Canal direct-flow <br />right assumed to be acquired. During the 28-year study period, the project <br />water supply at the dam would have ranged from a low of 21,900 acre-feet <br />in 1955 to a high of 224,000 acre-feet in 1972. It is possible that not <br />all of the direct-flow right will be acquired for project use. Adjust- <br />ments will be made in the cOntracts with the districts prior to the <br />initial delivery of project water to accommodate that possibility. <br /> <br />The following tabulation compares the marketable project water supply <br />reflected in the 1973 DPR and the current plan. As shown, it is assumed <br />that the Weldon Valley Canal direct-flow water rights will be acquired <br />and waters resulting from the rights will become part of the marketable <br />supply. <br /> <br />Average annual marketable project water supply <br /> (acre-feet) Direct flow <br /> Project water Proj ect supp ly <br /> yield from from Weldon Valley ava i1 ab 1 e <br />Study period Narrows Reservoir Cana 1 ri ght at dam <br />1947-1961 88,400 31,000 119,400 <br />(1973 DPR) <br />1947-1974 102,000 31,000 133,000 <br />(current plan) <br /> <br />The 102,000 acre-feet of project water yield from Narrows Reservoir <br />will result in 24,500 acre-feet of divertible return flows for a new <br />water supply of 126,500 acre-feet (109,700 acre-feet in 1973 DPR). <br /> <br />The total water supply available for the project service areas, <br />including the reservoir yield, the Weldon Valley Canal direct-flow <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.