Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />2. The equipment was acqui~ed by di~ect movement of p~ope~ty <br /> <br />f~om the G~and Junction Field Office, a loan of p~ope~ty f~om ARS, <br /> <br />pu~chase o~de~s, and pu~chase of some items locally. <br /> <br />3. An equ i pment t~ack i ng f i I e has been set up on the compute~ <br /> <br />to invento~y and t~ack al I of the majo~ equipment coming into and <br /> <br />going out of the Delta Field Office. <br /> <br />4. Sti II ing wells, fo~ potentiomete~s to measu~e inflow and <br /> <br />outflow, we~e fab~icated in the field office, using 10" and 12" PVC <br /> <br />pipe to keep cost down. <br /> <br />5. Standa~d site setups we~e identified and put on pape~ as <br /> <br />standa~d d~awings. Standa~d wi~ing and equipment needed fo~ each <br /> <br />site, was d~awn and put in document p~otecto~ behind each standa~d <br /> <br />d~awing. <br /> <br />F. IRRIGATION WATER MANAGEMENT: <br /> <br />I~~igation Wate~ Management is identified as a majo~ salt <br /> <br />~eduction component of the p~og~am. Seve~al actions have been <br /> <br />taken, in an effo~t to suppo~t and inp~ove SCS IWM guides. <br /> <br />1. Soi I p~obing wi II be used at all sites to aid in field <br />investigations of evapot~anspi~ation and soi I moistu~e deficits. <br /> <br />00C954 <br /> <br />6 <br />