<br />SUMMARY SHEETS (Continued)
<br />
<br />SUMMARY OF PROJECT COSTS BY FEATURE!/
<br />
<br />Proiect facilities
<br />
<br />McPhee Dam and Reservoir
<br />Highway improvement
<br />Pumping plants, 8witchyards.
<br />laterals and transmis8ion line.
<br />Dolores Tunnel and Canal
<br />Dove Creek Canal
<br />South Canal
<br />Towaoc Canal
<br />Dove Creek drains
<br />Towaoe drain.
<br />Dolores Protective Dike
<br />HcPbee Dam Powerplant
<br />Towaoe Canal Powerplant
<br />McPhee Powerplant transmisaioD linea
<br />Towaoe Powerplant traQ8~..ioD line.
<br />Cultural relaurces
<br />Dawson Draw Dam and Reservoir
<br />Mitigation mealures
<br />McPhee ReaeTVoir xecreation facilities
<br />Dolores River acee.s facilities
<br />Electric capacity entitlement
<br />KYle Canal lining
<br />Rocky Ford p~pe laterals
<br />Wetlands
<br />Permanent. operating facilities
<br />Operation and maiotenance housing
<br />Future-year capacity
<br />Service facilities, depreciation,
<br />and aal.vage.
<br />Capital.ized movable equipment
<br />. Total
<br />1/ Costs shown include
<br />neeri~g, and overhead d~ring
<br />~/ Breakdown of costs.
<br />
<br /> Coats
<br />Capacity/length (Unit . $1,0.0.0.)
<br />Section 5 Section 8 Total
<br />381,000 acre-feet $147,962 $147,962
<br /> 1,513 1,513
<br /> 72,970 72,970
<br />520. ct. 18,082 18,0.82
<br />380. cfs 45,270. 45,270.
<br />150. cfs 5,111 5,111
<br />420. cfs 59,80.5 59,80.5
<br />24 milea .2,604 2,604
<br />51 miles 5,516 5,516
<br /> 5,107 5,107
<br />1.35 megawatts 3,445 3,445
<br />12.2 megawatts 23,0.29 23,0.29
<br />5.1 miles 649 649
<br />0..2 miles 652 652
<br /> 17,60.2 17,60.2
<br />3,310. acre-feet $7,449 7,449
<br /> 4,623 4,623
<br /> 13,531 13,531
<br /> 1,481 1,481
<br /> BOa 80.0.
<br /> !{6,950. !/6,950.
<br /> !19,237 !19,237
<br /> 161 161
<br /> 6,785 6,785
<br /> 56 56
<br /> 180. 180.
<br />
<br />a
<br />a
<br />433,486
<br />preauthorization, advanced planning, general
<br />construction at January 1987 price levels.
<br />
<br />a
<br />a
<br />27,0.84 460.,570.
<br />investigatioDs, engi-
<br />
<br />ieature
<br />MVtC Canal lining
<br />Lone Pine Lateral
<br />Upper Hereana Lateral
<br />Total
<br />Rocky Ford pipe laterals
<br />
<br />Construction
<br />coat
<br />
<br />InvesH.a-
<br />tion coat
<br />
<br />!!?!!l
<br />
<br />$5,183,0.0.0.
<br />423,0.0.0.
<br />5,606,000
<br />7,659,0.0.0.
<br />
<br />$6,426,0.0.0.
<br />524,0.0.0.
<br />6,950.,0.0.0.
<br />9,237,0.0.0.
<br />
<br />$1,243,0.0.0.
<br />10.1,0.0.0.
<br />1,344,0.0.0.
<br />1,578,0.0.0.
<br />
<br />S-5
<br />
|