Laserfiche WebLink
<br />SUMMARY SHEETS (Continued) <br /> <br />SUMMARY OF PROJECT COSTS BY FEATURE!/ <br /> <br />Proiect facilities <br /> <br />McPhee Dam and Reservoir <br />Highway improvement <br />Pumping plants, 8witchyards. <br />laterals and transmis8ion line. <br />Dolores Tunnel and Canal <br />Dove Creek Canal <br />South Canal <br />Towaoc Canal <br />Dove Creek drains <br />Towaoe drain. <br />Dolores Protective Dike <br />HcPbee Dam Powerplant <br />Towaoe Canal Powerplant <br />McPhee Powerplant transmisaioD linea <br />Towaoe Powerplant traQ8~..ioD line. <br />Cultural relaurces <br />Dawson Draw Dam and Reservoir <br />Mitigation mealures <br />McPhee ReaeTVoir xecreation facilities <br />Dolores River acee.s facilities <br />Electric capacity entitlement <br />KYle Canal lining <br />Rocky Ford p~pe laterals <br />Wetlands <br />Permanent. operating facilities <br />Operation and maiotenance housing <br />Future-year capacity <br />Service facilities, depreciation, <br />and aal.vage. <br />Capital.ized movable equipment <br />. Total <br />1/ Costs shown include <br />neeri~g, and overhead d~ring <br />~/ Breakdown of costs. <br /> <br /> Coats <br />Capacity/length (Unit . $1,0.0.0.) <br />Section 5 Section 8 Total <br />381,000 acre-feet $147,962 $147,962 <br /> 1,513 1,513 <br /> 72,970 72,970 <br />520. ct. 18,082 18,0.82 <br />380. cfs 45,270. 45,270. <br />150. cfs 5,111 5,111 <br />420. cfs 59,80.5 59,80.5 <br />24 milea .2,604 2,604 <br />51 miles 5,516 5,516 <br /> 5,107 5,107 <br />1.35 megawatts 3,445 3,445 <br />12.2 megawatts 23,0.29 23,0.29 <br />5.1 miles 649 649 <br />0..2 miles 652 652 <br /> 17,60.2 17,60.2 <br />3,310. acre-feet $7,449 7,449 <br /> 4,623 4,623 <br /> 13,531 13,531 <br /> 1,481 1,481 <br /> BOa 80.0. <br /> !{6,950. !/6,950. <br /> !19,237 !19,237 <br /> 161 161 <br /> 6,785 6,785 <br /> 56 56 <br /> 180. 180. <br /> <br />a <br />a <br />433,486 <br />preauthorization, advanced planning, general <br />construction at January 1987 price levels. <br /> <br />a <br />a <br />27,0.84 460.,570. <br />investigatioDs, engi- <br /> <br />ieature <br />MVtC Canal lining <br />Lone Pine Lateral <br />Upper Hereana Lateral <br />Total <br />Rocky Ford pipe laterals <br /> <br />Construction <br />coat <br /> <br />InvesH.a- <br />tion coat <br /> <br />!!?!!l <br /> <br />$5,183,0.0.0. <br />423,0.0.0. <br />5,606,000 <br />7,659,0.0.0. <br /> <br />$6,426,0.0.0. <br />524,0.0.0. <br />6,950.,0.0.0. <br />9,237,0.0.0. <br /> <br />$1,243,0.0.0. <br />10.1,0.0.0. <br />1,344,0.0.0. <br />1,578,0.0.0. <br /> <br />S-5 <br />