Laserfiche WebLink
<br />SUMMARY SHEETS (Continued) <br /> <br />Irrigation <br />Credits toward investigation costs!.! <br />Dolores Water Cooservancy Di~ <br />Monte..-. Valley Irrigation <br />Ute Mountain Ute Wian Tr~ <br />Apportioned revelJJeS fraa Colorado <br />River Storage Project <br />Subtotal <br />ltIIlicipal and industrial water <br />Credits toward investigation costs!.! <br />Dolores Water Conservancy District <br />Ute Ibmtain 2~e Wian Tribe <br />~ubtotaP <br />Salinit)CI <br />Upper Basin Fund <br />Lower Basin Fund <br />Subtotal <br />Power <br />Credits toward investigations!! 32,000 <br />Power revelJJeZ/ 16,481,000 <br />Subtotal.:::! 16,513,000 <br />Total reinbJrsab le 337,578,000 <br />Total nonreinbJrsable 122,992,000 <br />Total 460 ,570 ,000 <br />1/ Fran Colorado River IlevelopDent Fund and contributed funds. <br />2f Includes $17,500 for operation, maintenance, and replaceoent 011 nonproject <br />water-conveyed in project facilities. <br />3f Indian payments toward irrigation construction costs will be deferred. <br />4f Construction costs allocated to mmicipal and industrial use and polier woold <br />be rePaid with interest at 6.063 percent amually. Q:qloond interest accrues on po<o1l!!r <br />expenditures after fiscal year 1983. 'lbe interest during construction figures for <br />polier and mmicipal and industrial water reflect the interest rate of, 6.063 percent. <br />5f ReinbJrsable salinity costs will be repaid with interest at 7.5 percent. <br />6f ReinbJrsable interest during construction will be calculated and repaid for <br />- the different purposes at different interest rates; therefore, a total interest <br />during construction hss no meaning. <br />!! 'lbe total nonreidlursable interest during construction figure reflects the <br />interest rate of 3.25 percent. <br /> <br />REPAYIt;M fF oosrs (5O-year repayment period) <br /> <br />Construction <br />costs <br /> <br />$387,000 <br /><D, 635, 000 <br />3,410,000 <br />5,445,000 <br /> <br />274,189,000 <br />lJ4, 066 ~OOO <br /> <br />88 ,000 <br />9,613,000 <br />1,224,000 <br />10,925,000 <br /> <br />911,000 <br />5,163,000 <br />6,074,000 <br /> <br />8-7 <br /> <br />Interest <br />wring <br />construction <br /> <br />$2,962,000 <br />386.000 <br />3,348,000 <br /> <br />108 ,000 <br /> <br />108,000 <br /> <br />2,643,000 <br />2,,~,000 <br />7f - <br />- 5O,~,OOO <br /> <br />Anmal <br />operation, <br />mintenance, <br />replace- <br />Dl!nt costs <br /> <br />$822,700 <br />35,600 <br />287,000 <br /> <br />1,145,300 <br /> <br />.,' <br /> <br />6,000 <br />1m <br />6,1m <br /> <br />4,100 <br />23 ,300 <br />27,400 <br /> <br />226,500 <br />226,500 <br />1,l.o6,000 <br />367,700 <br />1,m,700 <br />