Laserfiche WebLink
<br />o <br />00 <br />o <br />---l <br /> <br />In 1992, a status report was completed on ways to reduce the cost of <br />the canal and lateral lining program through construction coopera- <br />tive agreements, cost-sharing, and redesign of the delivery system <br />to reduce canal and lateral lengths. Piping the laterals on the <br />authorized portion of the unit was found to be cost effective <br />($60 per ton). Preparation of a preconstruct ion report was <br />initiated in 1992 and will be completed early in fiscal year 1993. <br />Construct,ion of the lateral system is scheduled to begin after the <br />winter water portion of the unit is completed in 1994. <br /> <br />Paradox Valley Unit, Colorado (Injection well construction and <br />testing) <br /> <br />Repairs and modifications to the injection facilities have been <br />completed. The well annulus monitoring system and the computer <br />control/data collection system have been modified, the system to <br />provide fresh water for diluting the brine during the 2-year test <br />has been improved, and the operating orders for the facilities have <br />been completed. Aquifer and pump testing with different blends of <br />brine and fresh water were conducted in 1992. <br /> <br />, <br />(j,) /,co..~ "if) <br />\ . <br />tu b:{ A.J) <br /> <br />,"\JQ.~~ ~~" <br /> <br />n <br />" <br />i <br />~,,^'7' /)c~\ l <br />C<y,Yi V LU,"..,J <br />C.~019pre,c) (.Uf'~ i/tQ/Y) A <br />;"0 ='-'\ X.>-~~'l, '^Ou__J <br />{t Uj.JJ J- -tcQC~ f--o <br /> <br />, <br /> <br />r'(l9~e.J <br /> <br />-- <br /> <br />,'do,>.J I.M.U- C/1.1 <br /><?0;sJ- (V D~ cell <br /> <br />" " "'~~'.C" J)~, ':-Vi .:LQ <br />Cj {,-">,--_\ ~.....- to --' - \ .-" <br /> <br />18 <br /> <br />J, <br /> <br />,- " <br />l,' :r <br />1~>Ja <br /> <br />i.- ':' <br />