Laserfiche WebLink
<br />003255 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />v <br /> <br />I <br />, <br />I <br />I <br />I <br />:1 <br />! <br />!I <br />I <br />I <br />I <br />I <br /> <br />as planned will provide for the full utilization of the usable runoff of <br /> <br />Florida River. The project was authorized for construction as a unit of <br /> <br />the Colorad.o River Storage Project by Public Law 485. Construction is to <br /> <br />be undertaken in 1960. <br /> <br />The project will serve supplemental irrigation water to the 15,430 <br />acres of irrigated land and water to 5,738 acres of new arable land. The' <br />total area of land to be irrigated is 21,168 acres. <br /> <br />The estimated present and potential stream depletion by use of <br /> <br />Florida River water is given in the following Table XVIII. <br /> <br />TABLE XVIII <br /> <br />Present annual stream depletion...................18,100 Acre Feet <br /> <br />Potential annual stream depletion <br />by irrigation............... <br />Potential annual stream depletion <br />by reservoir evaporation.... <br /> <br />12,900 Acre Feet <br /> <br />1,000 <br /> <br />II <br /> <br />II <br /> <br />Sub-total <br /> <br />13,900 Acre Feet 13,900 <br /> <br />II <br /> <br />II <br /> <br />Total <br /> <br />32,000 Acre Feet <br /> <br />-29- <br /> <br />~; <br /> <br />(j.. <br /> <br />~ i.l <br /> <br />, <br /> <br />- --,.-' ~ '.' <br /> <br />"y", .i, L ~~;<,;-t.; <br /> <br />t ~~j' <br />II <br />-,"~ - -.; <br />~;ioL; - <br />