Laserfiche WebLink
<br />CAPITAL COSTS <br /> <br />ALTEllliATIVE 8 <br />ELKHORN ONLY <br /> <br />PROJECT FEATURE <br /> <br />Elkhorn Darn and Reservoir <br />Elkhorn Dam Power Plant <br />Road Relocations <br />U.S. Forest Service Facilities Access <br />Land and Building Relocations <br />Subtotal <br />Contingencies (25%) <br />held Cost <br />General Administration, Legal, etc. <br />Engineering Y <br />Total Capital Cost <br /> <br />Annual Operation Maintenance and Replacement <br /> <br />Y Includes: <br /> <br />COST <br /> <br />Feasibility Studies/FEPC License Application, EIS <br />Final Designs and Specifications <br />Engineering Services During Construction <br /> <br />9b5-17-Alt-8 <br /> <br />$ 50,800,000 <br /> <br />5,780,000 <br /> <br />10,100,000 <br /> <br />1,440,000 <br /> <br />10,700,000 <br /> <br />78,820,000 <br /> <br />19,700,000 <br /> <br />98,520,000 <br /> <br />1,200,000 <br /> <br />9,880,000 <br />$109,600,000 <br /> <br />$ <br /> <br />235,000 <br /> <br />$1,100,000 <br />$3,000,000 <br />$5,7b0,000 <br />