Laserfiche WebLink
<br />CAP ITAL COSTS <br />ALTERNATIVE 2 <br /> <br />IDYLWILDE - GREY MOUNTAIN <br /> <br />PROJECT FEATURE <br /> <br />Idylwilde Dam and Reservoir <br />Idylwilde Dam Power Plant <br />Kinnikinick Afterbay Dam and Reservoir <br />Kinnikinick Dam Power Plant <br />Rustic Diversion Dam and Reservoir <br />Elkhorn Conduit <br />Cache la Poudre Forebay Dam and Reservoir <br />Cache la poudre Intake Conduit <br />Grey Mountain Power Plant <br />Access Tunnel <br />Tailrace Tunnel <br />Transmission Facilities <br />Grey Mountain Dam and Reservoir <br />Grey Mountain Dam Power Plant <br />State Fish Hatchery Relocation <br />Fort Collins Treatment Plant Relocation <br />Road Relocations <br />U.S. Forest Service Facilities Access <br />Land and Building Relocations <br />Subtotal <br />Contingencies (25%) <br />Field Cost <br />General Administration, Legal, etc. <br />Engineering Y <br />Total Capital Cost <br />Annual Operation Maintenance and Replacement <br /> <br />Y Includes: <br /> <br />COST <br /> <br />Feasibility Studies/FERC License Application, EIS <br />Final Designs and Specifications <br />Engineering Services' During Construction <br /> <br />965-17-Alt-2 <br /> <br />$ 57,200,000 <br />9,060,000 <br />1,530,000 <br />1,160,000 <br />3,100,000 <br />46,500,000 <br />10,100,000 <br />9,100,000 <br />23,100,000 <br />5,100,000 <br />800,000 <br />2,600,000 <br />56,300,000 <br />4,940,000 <br />800,000 <br />10,100,000 <br />19,500,000 <br />640,000 <br />27,300,000 <br />288,930,000 <br />72,270,000 <br />361,200,000 <br />3,500,000 <br />36,100,000 <br />$400,800,000 <br />$ 1,690,000 <br /> <br />$ 3,400,000 <br />$11,000,000 <br />$21,700,000 <br />