<br />
<br />COLORADO RIVER STORAGE PROJECT
<br />
<br />and delivered at transmission voltage at Hoover powerplant will
<br />be disposed of under the terms of such contracts,
<br />10, In the annual application of the flood control regulations tQ
<br />the ol?er~tion of Lake Mead, recognition shall be given to available
<br />capaCIty III upstream reservOIrs,
<br />Approved, April 2,1962.
<br />
<br />STEWART L. UDALL,
<br />Secretary of the Interior,
<br />(Published in Federal Register, 27 F,R, 6851 (July 19, 1962),)
<br />
<br />ADDI1'IONAL REGULATION No.1 TO THE GENERAL REGULATIONS FOR
<br />GENEHATION AND SALE OF POWER IN ACCORDANCE WITH THE
<br />BOULDER CANYON PROJEC'l' ADJUSTMENT ACT
<br />
<br />In accordance with the terms and conditions of the act of July 19,
<br />1940 (54 Stat. 774), and article 27 of the General Regulations pro-
<br />mulgated May 20, 1941, the following additional Regulation No, 1 is
<br />hereby promulgated:
<br />"Commencing with June 1, 1987, charges for electrical energy in
<br />addition to such other components as may then be authorized or
<br />required undor the then existing laws and regulations, and to the
<br />extent not inconsistent therewith, shall inclnde a component to
<br />return to the United States funds adequate to reimburse the Upper
<br />Colorado River Basin Fund for moneys e-''Pended from snch fnnd on
<br />account of allowances for Hoover diminution during the filling period
<br />of the storage project,reservoirs authorized by the Act of April 11,
<br />1956 (70 Stat, 105), in accordance with paragraph 5 of the General
<br />Principles to Govern, and Operating Criteria for, Glen Canyon
<br />Reservoir (Lake Powell) and Lake Mead during the Lake Powell
<br />Filling Period, approved April 2, 1962. Such component shall be
<br />sufficient, but not more than sufficient, to provide said reimbursement
<br />in equal annual installments over a period of years equal to the
<br />nmnber of years over which costs on account of allowance were
<br />incurred by the said Upper Colorado River Basin Fund."
<br />(Adopted by Secretal'y of the Interior Stewart L. Udall on July 12,
<br />1962. Published in Federal Register, 27 F.R. 6850 (July 19, 1962).)
<br />
<br />U,S. DEPARTMENT OF THE INTERIOR,
<br />BUREAU OF RECLAMATION,
<br />Washington, D.O., December 22, 1961,
<br />
<br />MEMORANDUM
<br />
<br />To: Secretary of the Interior.
<br />Through: Assistant Secrotary Kenneth Holum.
<br />From: Commissioner of Reclamation,
<br />Subject: Principles to govern, and operating criteria for, Glen Canyon
<br />Reservoir (Lake Powell) and Lake Mead during the Lake Powell
<br />filling period, .
<br />By memorandum of 'Jnne 13, 1961, I transmitted to you revised
<br />general principles and operating criteria recommending that you adopt
<br />
<br />5
<br />
<br />
|