|
<br />OOLORADO RIVER STORAGE PROJECT
<br />
<br />37
<br />
<br />Southern Oalifornilt Edison 00.: Stlttes that the provisions
<br />contltined in article 5 of the filling criteria and in the proposed
<br />ltdditional reguh,tion No.1, relative to reimbursement of the
<br />Upper Colorado River Basin fund from charges for eleetrical
<br />energy to be made at the Hoover powerplant subsequent to
<br />June 1, 1987, would not appear to be authorized by existing
<br />h,w, but mther to be in confliet therewith. .
<br />Oomments h,we not been reeeived from the cities of Burbank,
<br />Glendale, ltnd Pasadena, the remaining three Hoover power
<br />eontraetors.
<br />lnasmueh as the comments reeeived, copies of which are attaehed,
<br />either do not object to issuanee of additional regula.tion No.1, or, in
<br />my opinion, do not offer substantive reasons opposing its issuance,
<br />I recommend that you now formally promulgate additional regulation
<br />No.1 ltnd that it and the filling eriteria approved by you on April 2
<br />be pnblished in the Federal Register. Attaehed for your signature
<br />are the docunlents necessH,ry to accomplish this.
<br />
<br />FLOYD E. DOMINY.
<br />
<br />,
<br />
<br />U.S. DEPARTMENT OF THE INTERIOR,
<br />BUREAU OF RECLAMATION,
<br />Washington, D.O., April 4, 1962.
<br />CHIEF ENGINEER, COLORADO RIVER COMMISSION OF NEVADA,
<br />Post Office Box 1748, Las Vegas, Nev.
<br />DEAR SIR. On behalf of the Seeretary of the Interior and as required
<br />by artiele 27 of the "General Regulations for Generation and Sale of
<br />Power in Aeeordanee With the Boulder Oanyon Projeet Adjustment
<br />Ad," I enelose for your eonsideration 11 eopy of additional regulation
<br />No. 1 to the "General Regulations. " Your eomments on this addi-
<br />t.ionl11 reguhltion are. requested within 30 days.
<br />Enclosed also is a eopy of "General Prineiples To Govern, and
<br />Operating Criteria for Glen Canyon Reservoir (Lake Powell) and
<br />Lake Mead During the Lake Powell Filling Period," approved by the
<br />Secretary on April 2; 1962, of which additional regulat.ion No.1, upon
<br />issuanee, will be made a part.
<br />As a third item there is enelosed a set of the tabular forms together
<br />with explanatory material, whieh will be nsed to eompute defieieneies
<br />in firm power generation at Hoover Dam during the filling period as
<br />provided in principle 5 of the "General Principles."
<br />Sincerely yours,
<br />
<br />FJ~OYD E. DOMINY, Commissioner.
<br />
<br />;
<br />
<br />ARIZONA POWER AUTHORITY,
<br />Phoenix, Ariz., May 1,1962.
<br />
<br />,
<br />
<br />Mr. FLOYD E. DOMINY,
<br />Oommissioner, Bureau ~f Reclamation,
<br />Washington, D.O.
<br />DEAR SIR: Your letter of April 4, 1962, to the Arizona Power
<br />Authority, transmitting copies of "Additional Regulation No. 1 to
<br />the Geneml Regulations for Generation and Sale of Power in Aeeord-
<br />anee With the Boulder Oanyon Projeet Adjustment Aet," of "General
<br />
<br />
|