My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00585
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:44 PM
Creation date
10/11/2006 9:50:19 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.600.10
Description
Colorado River Operating Annual Reports
Basin
Colorado Mainstem
Date
1/1/1986
Author
USDOI/BOR
Title
Operation of the Colorado River Basin 1986 Projected Operations 1987
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Power Operations and Major Maintenance Activities <br /> <br />Upper Basin. Colorado Ri.er Storage Project <br /> <br />Westinghouse Electric Corporation continued contract work <br />to uprate the generators at Glen Canyon Powerplanl. During <br />1986, work was completed on units 8 and 7; later in the year, <br />work was started on unit 4. U prating is scheduled for <br />completion by early April 1987. <br /> <br />The following table summarizes CRSP generation, purcbases, <br />disposition, and revenues from power operations for fIScal <br />year 1986, and present projections for fIScal year 1987. The <br />total revenue from power operations in fiscal year 1986 was <br />$122,479,340. <br /> <br />CRSP Power Generation <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.