Laserfiche WebLink
<br />Allocation and Repayments <br />Allocation of Federallnvestment <br /> <br /> <br />PO.......'hou'S(!'nlet'Of. FlamlngGo,geDlIm <br /> <br />A preliminary allocation Of the total <br />estimated costs of all authorized projects <br />is summarized in lhis lable. <br /> <br />Allocations to the various purposes <br />authorized under Reclamation law are re- <br />quired by section 6 01 Public Law 84.485, <br />fhe Colorado River Storage Project Act. <br />Specific fish and wildlife and recreation <br />expenditures authorized by section 8 of <br />this act are excluded. Final allocation <br />reports have been prepared on the Colo- <br />rado River Storage Project; on Emery <br />County, Florida. Paonia. Seedskadee. Sill. <br />and Smith Fork Projects; and on the Ver. <br />nal Unit 01 the Central Utah Project. <br /> <br />20 <br /> <br />Project Costs Allocated <br />(Excludes <br />Section 8 Costs) <br /> <br />(Thousands <br />aldoUars) <br /> <br />Reimbursable Allocations; <br />Irrigation <br />Power <br />Municipal and Industrial Water <br />Other <br /> <br />1,403,446 <br />862,108 <br />501,327 <br />3,668 <br /> <br />Tolal <br /> <br />2.770,549 <br /> <br />Nonreimbursable Allocations: <br />FlOOd Control <br />Fish and Wildlife <br />Recreation <br />Road Relocation Costs <br />Archeological Preservation <br />Total <br /> <br />35,649 <br />127,758 <br />4,901 <br />17,833 <br />750 <br />186,891 <br /> <br />Other: <br />Navajo Indian Irrigation <br />Project' <br />Total Costs Allocated <br />Section 8 Costs: <br />Fish and Wild Ii Ie <br />Recreation <br />Total Costs Not Allocated <br />Total <br /> <br />391,220 <br />3,348,660 <br /> <br />73.192 <br />115,935 <br />189,127 <br />3,537,787 <br /> <br />~rrneolo!C<I<'Slruchon""'''''$ub+e<.110t'''a<tOt <br />,jU'1'.'W,~7St.'~1 <br />