My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00551
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:12:36 AM
Creation date
10/11/2006 9:49:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
2/27/1951
Author
CWCB
Title
Report of Policy and Review Committee with Proposed Principles of Operation - Appendix A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />tZ:W <br /> <br />No charge shall ever be imposed for >later released from, or made <br /> <br />available by reason of releases from, the replace"lent capacity of the <br /> <br />,Aspen_Hese1'Voir. <br /> <br />7. That portion of the total capacity of the Aspen Reservoir not <br /> <br />needed as replacement capacity constitutes surplus capacity. Water stored <br /> <br />in such surplus capacity may be sold or leased by the United States to <br /> <br />water users in Western Colorado. Charges for the use of such water shall <br /> <br />be conparable to char!:;es for use of project water for similar purposes <br /> <br />in Eastern Colorado ,nth appropriate adjustment for the repayment ability <br /> <br />of such water users. If it hereafter appears that the cost of procuring <br /> <br />water, from sources other than the surplus capacity of the Aspen Reser- <br /> <br />votr, for the same uses ;<~tjlOSe,tO ,Vlhich~'~ater from,::Y1E<~rBJ;\f,t:capacity <br /> <br />--- ~ - ------. _:--~~--=--= <br />of the reservoir is to be"rnaae available 'snall=:~'ave be.~nc:ipcT.?,ased"by <br /> <br />-reason of the construction and operation of th;~projact; thenthe-chirg~~ <br /> <br />~__4_ <br />--- - ~ ~-- <br /> <br />for Via tel' released from the surplus capacity shall be diminished by the <br /> <br />amount of such increase in cost. <br /> <br />8. Project diversions from Lime Creek shall be made only in the <br /> <br />months of May and June of each year. <br /> <br />9. To protect recreational values, including fishinG, no diversions <br /> <br />from Western Colorado ,nIl be made nhich reduce the remaining aggregate <br /> <br />., <br /> <br />stream flows to less than either of' the follovling minimum standards: <br /> <br />(a) The Frying ?on collection system at the points <br /> <br />of c,iversion collect,ively, .o;:clusive of Lime Creek, -- IS <br /> <br />c.f.s., October I thrOUGh lmrch 31; 30 c.f.s., April 1 through <br /> <br />September 30. <br />
The URL can be used to link to this page
Your browser does not support the video tag.