<br /> WESTERN AREA POWER ADMINISTRATION
<br /> POSSIBLE SCHEDULE
<br /> c/// FOR GeES STUDY FLOWS
<br /> December 1989
<br />Minimum Target Maximum Target Release Max illlUm Ramping Rates
<br />Release Tolerance Release Tolerance Fluctuat ion Up Down
<br />(cfs) II (cfs) 21 (cfs) 31 (cfs) 41 (cfs) (cfs/hr) (cfs/hr) Period
<br />1,000 :!: 250 25,000 :!: 2,500 24,000 7,200 7,200 Dee, Jan, Feb
<br />1.000 :!: 250 20,000 :!: 2,000 19,000 7,200 7,200 Dee, Jan, Feb
<br />1,000 :!: 250 20,000 :!: 2,000 19,000 3,600 3,600 Oct, Nov
<br />3,000 :!: 750 25,000 :!: 2,500 22,000 7,200 7,200 July, Aug
<br />3,000 :!: 750 15,000 :!: 2,500 22,000 3,600 3,600 Apr, May, June
<br />5.000 :!: 1,250 25,000 :!: 2,500 20,000 7,200 7,200 July, Aug
<br />5,000 :!: 1,250 15,000 :!: 1,500 10,000 7,200 7,200 Apr, May, June
<br />5,000 :!: 1,250 25,000 :!: 2,500 20,000 3,600 3,600 July, Aug
<br />5,000 :!: 1,250 15,000 :!: 1,500 10,000 3,600 3,600 Apr, May, June
<br />
<br />
<br />!I Minimum release is assumed an average target release rather than an absolute minimum.
<br />U Minimum release target tolerance is :!: 25 percent.
<br />H Maximum release is assumed an average target release rather than an absolute maxilllUm.
<br />~I Maximum release target tolerance is :!: 10 percent.
<br />
|