Laserfiche WebLink
<br />Mineral <br />Resource <br />Develop- <br />ment <br /> <br />w <br />o <br /> <br />PROPOSED <br />ACTI ON <br /> <br />ALL <br />WILDERNESS <br /> <br />Redcloud ?eak <br /> <br />NO <br />WILDERNESS <br /> <br />CONFLICT <br />RESOLUTION II <br /> <br />WILDERNESS <br />MANAGEABILITY <br /> <br />The proposed action would <br />withdraw 30,400 acres from <br />mineral entry, sUbject to <br />valid existing rights. Due <br />to predicted valid existing <br />rights development of three <br />mines for the production of <br />base and precious metals in <br />the Silver and Cooper Creek <br />drainages would still occur. <br />The 10,175 acres recommended <br />as nonsuitable would remain <br />open to mineral entry. Pro- <br />duction of 4 million tons of <br />alunite as well as an unquan- <br />tified amount of base and <br />precious metals from two <br />mines would occur. Alunite <br />would generate 110 jobs and <br />Increase per capita income <br />by nineteen percent. <br /> <br />Subject to valid existing <br />rights 40.575 acres would be <br />withdrawn from mineral entry <br />and the mineral potential <br />would be foregone. Surface <br />disturbing exploration <br />activity would be foregone. <br />Development of 4 million <br />tons of alunite ore annually <br />would not occur. The pro- <br />jected resultant 110 Jobs <br />and nineteen percent <br />increase in per capita <br />Income would also not <br />occur. Five small <br />underground mines for the <br />production of base and <br />precious metals would result <br />from valid existing rights. <br /> <br />The entire 40,575 WSA <br />would remain open to <br />mineral entry with <br />development of base <br />and precious metals <br />predicted to result from <br />5 small mines. If <br />developed, the alunite mine <br />on Red Mountain would <br />produce 4 million tons <br />of ore annually, generate <br />110 jobs and increase <br />per capita income nine- <br />teen percent. <br /> <br />Subject to valid existing The proposed action woulc <br />rights mineral develop- withdraw 11,140 acres <br />ment would be foregone from mineral entry. sub- <br />on 37,530 acres recommended ject to valid existing <br />as suitable. Valid existing rights. Due to predicted <br />rights would allow develop- valid existing rights <br />ment of three mines In development of three <br />Silver and Cooper Creeks. mines for the production <br />Two small mines and mineral of base and precious <br />exploration would be allowed metals in the Silver and <br />on the 3.045 recommended Cooper Creek drainages <br />nonsultable. Development of would still occur. The <br />4 million tons of alunite 29.435 acres recommended <br />would not occur. The as nonsuitable would <br />projected resultant 110 remain open to mineral <br />jobs and nineteen percent entry. Production of 4 <br />increase in per capita million tons of alunite <br />income would also not as well as an unquant- <br />occur. ified amount of base and <br />precious metals from <br />two mines would occur. <br />Alunite development <br />would generate 110 jobs <br />and increase per capita <br />Income by nineteen <br />percent. <br />