Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Table III-I <br /> <br />'1':fl <br />'0 <br />ll'v <br />Wi <br /> <br />Practices Installed <br />SCS Onfarm Improvement Program <br />Well ton-Mohawk Irrigation and Drainage District <br /> <br /> PRACTICES 1982 CUMULAtIVE <br />1. Ditch Lining (FT) 128,571 961,656 <br />2. Land Leveling (AC) 4,902 30,950 <br />3. Structures for Water Control and <br /> Meaaurement (NO) 1,012 7,136 <br />4. Soil Improvement (AC) 214 1,870 <br />5. Pumping Plants (NO) 0 10 <br />6. Drip, Bubbler Irrigation Systems (NO) 1 10 <br />7. Vertical Underground Barriers (FT) 7,877 14,505 <br />Federal Cost $ $ 2,117,401 $ 11,540,746 <br />Nonfederal Landowner Cost $ 705 ,800 3,846,915 <br />Total Cost 1/ $ 2,823,201 $ 15,387,661 <br /> <br />1/ Excludes 1982 SCS technical assistance costs of $370,970 and total SCS <br />technical assistance to date of $2,395,273. <br /> <br />Figure !Ir~3 <br /> <br />WEILTON-MOHAWK 1975-1982 <br />DRAINAGE RE'rtJRN FLOW (ACRE FEE'I') <br />ACTUAL AND PROJECTED FLOWS <br /> <br />2QQQQQ <br /> <br />. <br /> <br />\", <br />;............. <br />AC'I'IlAL/ <br />FLOW <br /> <br /> <br />\1 <br /> <br />P <br />R <br />o <br />oJ <br />E I SQlmg <br />C <br />T <br />E <br />D <br /> <br />" ,PROJECTED <br />........ 1 FLOW <br /> <br />1974 INITIAL GOAL 136,000 AC. FT... " <br />" <br /> <br />REVISED 1979 GOAL 108,000 AC. FT'-;1 <br /> <br />...... <br />'. <br />, <br />, <br />", <br />, <br />'. <br /> <br />12 <br /> <br />IlaaQ <br /> <br />1................,'...'.....,...................1...................,..................., <br /> <br />, . 7&: 76 77 78 7Q Cl3 81 ft 83 84 SS 85 <br /> <br />YEAR <br />11 <br /> <br />" ""'. <br />