Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />,. <br /> <br />" <br /> <br />. <br /> <br />;- ....... ; ~ ,~ <br />t:.~ N~) <br /> <br />45 <br /> <br />8mpire Canal <br /> <br />The headgate of the Empire Intake Canal lies approximately 9 ditch miles <br /> <br />westerly of the proposed <lam site. This proposed taking will require a new head- <br /> <br />gate and po,ssible relocation of part of this canal. <br /> <br />Bijou Canal <br /> <br />The Bijou intake point lies approximately 1 mile WGst of thG proposed dam <br /> <br />site. This proposGd taking will require a new hcadgate and po'-,sible realignment <br /> <br />of this canaL <br /> <br />Latham Dikh <br /> <br />^ppro:dn,atdy '1-1 /-" miles of the Lalha\ll Diicll lie in and out of the souther- <br /> <br />ly boundary of ti',,~ pro,o,)sed fee ta!dn;;;. The proposGd taking would require the <br /> <br />abandonment 'of this p"l'lion of the ditcil. <br /> <br />Plumb DItch <br /> <br />The easterly 2 miles, approximately, of the Plumb Ditch lie within the <br /> <br />proposed t: ':ing. Tilis portion llf tllis ditch would be abamlunecl. <br /> <br />Hoover Ditdl <br /> <br />The entire BOOY'Jl' Diteh lies within the proposed area and would be <br /> <br />abandoned. <br /> <br />Other minor ditches, or portions thereof, lie within the proposed takings. <br /> <br />As notecl previously, since the wat8r riZht has been includ",d with the market value <br /> <br />of the land, these l03sG,s arc included in our c3tim",te of con;pcn:;ation. <br />