Laserfiche WebLink
<br />G0Q2Z3 <br /> <br />-2- <br /> <br />From the potential projects developed by the various participating agencies, <br />a general plan of basin development wi I I be proposed along with a time schedule <br />for completion. <br />The Planning Report wi I I also include recommendations for action by local <br />entities and state and federal agencies which would enhance the water and land <br /> <br />resource development of the basin. <br /> <br />Assistance Requested <br /> <br />The target dates for completion of these reports are as shown below in <br /> <br />t'he right hand column. In order to allow sufficient time tor analysis, those <br /> <br /> <br />contributing reports concerning the various river basins are requested to <br /> <br /> <br />rnake them ava i I ab I e by the dates shown in the center co I umn. The agenc i es <br /> <br /> <br />from whom help is anticipated, and the specific Items of assistance requested of <br />them are I isted on the fol lowing pages, The Commission recognizes the need <br /> <br /> <br />and desirabi I ity ot complete individual agency reports and does not intend that <br /> <br /> <br />reports be limited to the specific information requested in this outline. <br /> <br />Bas i n <br /> <br /> <br />Big Blue Basin <br /> <br /> <br />Elkhorn Basin <br /> <br /> <br />Little Blue Basin <br /> <br /> <br />Niobrara <br /> <br /> <br />Nemaha <br /> <br />Date of Submission <br /> <br />Date of Completion <br /> <br /> <br />September, 1968 <br /> <br /> <br />September, 1969 <br /> <br /> <br />September, 1970 <br /> <br /> <br />February, 1971 <br /> <br /> <br />July, 1971 <br /> <br />Septembe r, 1968 <br />September, 1969 <br />February, 1970 <br />July, 1970 <br />