My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00452
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:07 PM
Creation date
10/11/2006 9:46:38 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River Basin General Publications - Correspondence - Reports
State
CO
Basin
Gunnison
Water Division
4
Date
10/27/1992
Author
Unknown
Title
Gunnison Basin Models - Planning Model - 1991-1992 - Draft Functional Specification - Gunnison River Basin Planning Model
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />€fo' 51~ 3 <br /> <br />Functional Specification for the Planning Model <br /> <br />computer-based system of databases and models, accessible to users throughout the state, that <br />would facilitate the study of water-related technical and policy problems. While the CRDSS is <br />still very early in the planning stages and its implementation still subject to many funding <br />decisions, the design of the Planning Model should prudently anticipate its future integration <br />into the CRDSS. <br /> <br />Development of the Planning Model will try to anticipate this future integration in three <br />ways. First, the underlying the Planning Model will be configured to correspond as closely as <br />possible to the physical network of river reaches and tributaries that comprise the Gunnison <br />River basin. This correspondence will enhance the ability of georelational functions of the <br />CRDSS to communicate with the Planning Model. <br /> <br />Second, the input and output data structures created and/or referenced by the Planning <br />Model's user interface will be designed to facilitate low-level access independent of the user <br />interface. This access will enhance the ability of future CRDSS user- and data-interface <br />programs to communicate with and manipulate the operation of the simulation component of <br />the Planning Model. <br /> <br />Third, the Hydrosphere design team will stay in communication with the CRDSS team to <br />keep abreast of CRDSS developments that suggest additional or alternative directions for <br />Planning Model development efforts. <br /> <br />23 <br /> <br />ii <br /> <br />/J",FlOMmlJf\OO1\AJNCPICIOIIl'T1Il'EC,OOC ...r.,__ 3, unt:l1..... ,(1'''...'0..... 2lI, "n ,,,n_ <br /> <br />; .'"' <br />.fu. .,1-_~. ii... ~ ;Li.~ <br /> <br />.". <br />
The URL can be used to link to this page
Your browser does not support the video tag.