Laserfiche WebLink
<br />.... <br />CJ:) <br />~ <br />co <br /> <br />Table 14B <br /> <br />ESTIMATE Of OPERATING cosrs fOR VAPOR COMPRESSI(]\! VERTICAL <br />ruBE EVAPORAIDR - MULTISTAGE fLASH PROCESS <br /> <br /> <br /> . <br /> PLANT CAPACITY <br /> 8 mgd-330 daysfyr <br /> COST CENTER <br /> Rate Number Total <br /> S/yr Required $/yr <br />7. Oper8tin~ Labor <br /> SupervIsor 18.UOO I 18.000 <br /> Engineer 16,000 I 16,000 <br /> Operators 10,000 8 80,000 <br /> Qu'ali ty Control 12,000 I 12,000 <br /> Clerk, Janitor, Guard 7,000 3 21,000 <br /> Total Operating Labor 14 147,000 <br /> 15% Payroll Extras 22,050 <br />8. Main~enance Labor <br /> Supervisor 14,000 I 14,000 <br /> Me,chanical 12,OUO 4 48,000 <br /> EI:ectrical 13,000 2 26,000 <br /> - <br /> Total Maintenance Labor 7 88,000 <br /> 15% Payroll Extras 13,200 <br />9. Gen~ral Administration Overhead 81,075 <br /> 30% IOpt. Main. Lahor and P. E. ) <br />10. Mainten$nce Su1plies 40,900 <br /> 0.5% Total P ant Cost <br />II. Chemicals <br /> Sulfuric Acid 2.2 Ib/kgal Water I. 75 ~/Ib 83.160 <br /> Qllorine, and Defoamer 12,500 <br />12. Fuel Cost Natural Gas 145 x 106 Btu~hr 265.950 <br /> 19.2 Ib Water/103 Btu, SO.23/IU6 tu <br /> <br />49 <br />