Laserfiche WebLink
<br /> <br />... <br />e.o <br />loClo <br />Ul <br /> <br />Table 68 <br />ESTIMATE OF OPERATING COSTS FOR MULTISTAGE FLASH'PROCESS <br /> <br /> PLANT CAPACITY PLANT CAPACITY <br /> 10 mgd_330 days/yr 50 mgd_330 dsys/yr <br /> COST CENTER <br /> Rate Number Total Number Total <br /> S/yr Required S/yr Requi red S/yr <br />7, OperatinlJ Labor <br /> Superv1sor 18,000 1 18,000 1 18,000 <br /> Engineer 16,,000 1 16,000 1 16,000 <br /> Operators 10,000 8 80,000 12 120,000 <br /> guality Control 12,000 1 12,000 1 12:,000 <br /> lerk1 Guards, Janitor 7,000 3 21,000 10 70,000 <br /> Total Operating Labor 14 147,000 25 236,000 <br /> 15% Payroll Extras 22,050 35,400 <br />8, Maintenance Lahor <br /> Supervisor 14,000 1 14,000 <br /> Mechanical 12,000 2 24,000 4 48,000 <br /> Electrical 13,000 2 26,000 4 52,000 <br /> Instrunent 12,000 1 12,000 <br /> Total Maintenance Labor 4 50,000 10 126,000 <br /> 15% Payroll Extras 7,500 18,900 <br /> Total Labor plus P.E. 18 226,550 35 416,300 <br />9, General and Administrative OWer head <br /> 30% (Opt, Main, Labor and P,E,) 67, 965 124,890 <br />10, Supplies and Maintenance Materials <br /> 0,5% Total Plant Cost 46,815 190,500 <br /> , <br />11. Chemicals <br /> Sulfuric Acid $O,OI75/lb 115,592 577,Q62 <br /> Chlorine SO,063/1b 4,200 20,800 <br />12, Steam Costs 30~/1 06 8tu 671,268 2,948,785' <br />13, Electric power O,45~/kwhr , 103,950 519,750 <br /> <br />14 <br />